Laserfiche WebLink
be submitted to the Director of Community Development for review and approval <br /> prior to the occupancy of the first unit. <br /> 27. All water devices, such as faucets, toilets, shower fixtures, etc., shall be low-flow <br /> water conservation devices. The water conservation devices shall be stated on <br /> the plans submitted for issuance of a building permit. <br /> 28. This approval does not guarantee the availability of sufficient water capacity to <br /> serve the project. Prior to the recordation of a Parcel Map, issuance of a grading <br /> permit, issuance of a building permit, or utility extension approval to the site, <br /> whichever is sooner, the applicant shall submit written verification from Zone 7 <br /> Water Agency or the City of Pleasanton's Utility Planning Division that water is <br /> available for the project. To receive the verification, the applicant may need to <br /> offset the project's water demand. <br /> 29. Prior to issuance of a building permit, the applicant shall pay the applicable Zone <br /> 7 and City connection fees and water meter cost for any water meters, including <br /> irrigation meters. Additionally, the developer shall pay any applicable Dublin-San <br /> Ramon Services District (DSRSD) sewer permit fee. <br /> 30. Only recycled water shall be used on the site during the grading and construction <br /> periods, and this specification shall be included on all grading plans and other <br /> construction documents. <br /> Building and Construction Details <br /> 31. Details of the horizontal siding of the new townhomes shall be incorporated into the <br /> plans submitted to the Building and Safety Division for plan check and permits <br /> issuance and shall be subject to the review and approval of the Director of <br /> Community Development prior to issuance of building permits. <br /> 32. The stucco for the townhomes shall be smooth and hand-troweled. If the applicant <br /> can demonstrate to the satisfaction of the Director of Community Development that <br /> the appearance of hand-troweled stucco can achieved mechanically, mechanical <br /> application of the stucco is allowed. Prior to issuance of a building permit, the <br /> applicant shall submit a finished stucco sample for the buildings. The stucco sample <br /> shall be subject to the review and approval of the Director of Community <br /> Development prior to application/installation on the buildings. <br /> 33. Wood-, fiberglass-, or vinyl-framed/sashed windows shall be utilized on the <br /> structures. If fiberglass-or vinyl-framed/sashed windows are used, they shall have <br /> a similar frame and sash thickness as found on a traditional wood-framed/sashed <br /> window unless the required noise mitigation for this project prevents compliance <br /> with this requirement. In addition, simulated mullions must appear real and be on <br /> both sides of the glass. Windows of new structures shall be recessed two inches <br /> from the outside face of wall with wood sills. No reflective glass is allowed. The <br /> window glazing shall be clear with no tint. Manufacturer's specification sheets, <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 7 of 30 <br />