Laserfiche WebLink
a. Landscape Documentation Package, which includes date; project <br /> applicant/contact information; project address; total landscape area; project <br /> type (new, rehabilitated, public, private, cemetery, homeowner-installed); <br /> water supply type (potable, recycled, well, greywater, combination of <br /> potable/greywater); and applicant signature/date with the statement that "I <br /> agree to comply with the requirements of the prescriptive compliance option <br /> of the Water Efficient Landscape Ordinance." <br /> b. Landscape Plan documenting: incorporation of compost at a rate of at least <br /> 4 cubic yards/1,000 square feet; compliance with the plant material criteria; <br /> compliance with the turf criteria; and compliance with the irrigation system <br /> criteria. <br /> Green Building and Water Conservation <br /> 24. The current State of California's Green Building Standards Code, "CALGreen," shall <br /> apply, as applicable. <br /> 25. All appliances and/or systems shall meet Energy Star standards. The appliance(s) <br /> or system(s) shall be stated on the plans submitted for issuance of a building permit. <br /> 26. All new buildings shall be constructed to allow for future installation of a photovoltaic <br /> (PV) system and solar water heating systems. The project applicant shall comply <br /> with the following requirements for making all new dwelling units photovoltaic-ready <br /> and solar-water-heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic <br /> area to the building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an <br /> "inverter" required to convert the direct current output from the photovoltaic <br /> panels to alternating current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a <br /> structural engineer to accommodate the additional weight of a prototypical <br /> photovoltaic system beyond that anticipated for roofing; <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-water-heating tank. <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Director of Community Development for review and approval before issuance of the <br /> first building permit. The project developer shall provide the future owners the <br /> necessary information delineating the means by which photovoltaic panels can be <br /> applied to the roofs of the structures covered by this approval. This information shall <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 6 of 30 <br />