My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
092016
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:16:59 PM
Creation date
9/15/2016 3:11:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/20/2016
DESTRUCT DATE
15Y
DOCUMENT NO
02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23. The buildings covered by this approval shall comply with the current City of <br />Pleasanton's Garbage Service's recycling and composting programs. The trash <br />enclosure shall be sized to accommodate both trash and recycling containers. The <br />trash and recycling containers shall be kept inside the enclosure at all times, <br />except during pick -up times. The trash enclosure shall meet all City and Livermore <br />Pleasanton Fire Department requirements. <br />24. All appliances and /or systems shall meet Energy Star standards. The appliance(s) <br />or system(s) shall be stated on the plans submitted for issuance of a building permit. <br />25. All buildings shall be constructed to allow for future installation of a photovoltaic (PV) <br />system and solar water heating systems. The project applicant shall comply with <br />the following requirements for making all new dwelling units photovoltaic -ready and <br />solar- water - heating- ready: <br />a. Electrical conduit and cable pull strings shall be installed from the roof /attic <br />area to the building's main electrical panels; <br />b. An area shall be provided near the electrical panel for the installation of an <br />"inverter" required to convert the direct current output from the photovoltaic <br />panels to alternating current; <br />c. Engineer the roof trusses to handle an additional load as determined by a <br />structural engineer to accommodate the additional weight of a prototypical <br />photovoltaic system beyond that anticipated for roofing; <br />d. Plumbing shall be installed for solar -water heating; and <br />e. Space shall be provided for solar- water - heating tank. <br />These measures shall be shown on the building permit plan set submitted to the <br />Director of Community Development for review and approval before issuance of the <br />first building permit. The project developer shall provide the future owners the <br />necessary information delineating the means by which photovoltaic panels can be <br />applied to the roofs of the structures covered by this approval. This information shall <br />be submitted to the Director of Community Development for review and approval <br />prior to the occupancy of the first unit. <br />26. The project developer shall provide a construction plan with the building permit plan <br />set for review and approval by the Director of Community Development and Chief <br />Building Official before issuance of a building permit. The construction plan shall <br />show the proposed location of materials and equipment storage, scaffolding, safety <br />measures to protect the public from construction activities, temporary fencing, <br />construction trailers, parking of construction vehicles, location of portable toilets, etc. <br />Said plan shall be designed to minimize the loss of public parking spaces and, if any <br />PUD -118 & P16 -0203 4791 Augustine Street <br />Draft Conditions of Approval 5 of 28 Mixed -Use Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.