My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
090616
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:09:41 PM
Creation date
8/31/2016 3:00:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/6/2016
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> On November 18, 2014, the City Council approved the Pleasanton Pioneer Cemetery <br /> Master Plan including an extensive Implementation Plan. The City Council also <br /> authorized the allocation of $170,000 to conduct administrative and professional tasks <br /> (Priority 1 Tasks) as detailed in the Master Plan, and directed staff to consider funding <br /> options for immediate and secondary site related needs as detailed in the Master Plan <br /> as part of the FY 2015/2016 CIP budget. <br /> At the June 7, 2016 meeting, City Council allocated $500,000 to the Pioneer Cemetery <br /> Master Plan Implementation Reserve Fund and approved staff's recommendations <br /> regarding Master Plan Implementation in Fiscal Year 16/17. This included Project <br /> Number One and Project Number Two to be completed concurrently with the Veterans <br /> Memorial project. Project Number One provides a more intensive site clean-up prior to <br /> the dedication of the Veterans Memorial. The Master Plan identified these tasks, some <br /> of which are not included in the current maintenance contract, requiring funding to be <br /> drawn from the reserve fund. Project Number Two provides repaving of the central <br /> roadway leading to the Veterans Memorial along with irrigation and plantings along the <br /> roadway. It also addresses the need for storage and parking on the site. <br /> DISCUSSION <br /> Change Order Number One with Goodland Landscape will construct a portion of Project <br /> Number Two; installation of an irrigation mainline running east to west across almost the <br /> entire width of cemetery property, and repaving of the central road which is currently in <br /> poor condition and will become worse due to trenching required to install the irrigation <br /> mainline system. Enhanced landscaping and the required irrigation lateral system along <br /> the road is currently being designed by the City Landscape Architect. It is likely that the <br /> plantings will be installed by the City's Parks Division of the Operations Services <br /> Department, although those details have not yet been worked out. <br /> Submitted by: Fis I Review: Approved y: <br /> (A.A <br /> Stephen KJrl patrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.