Laserfiche WebLink
qualified biologist documenting survey results shall be submitted to the Director of <br /> Community Development for review and approval. <br /> 36. Pre-Construction Dusky-footed Woodrat Survey: Prior to commencing any construction- <br /> related activities, as determined by the biologist, that may result in the destruction of <br /> dusky-footed woodrat nests, surveys shall be conducted by a qualified biologist to <br /> determine the occurrence of the nests. If found, construction fencing shall be installed <br /> around the nest at a distance specified by the biologist to avoid impacts, and a wildlife <br /> biologist shall be present during a timeframe specified by the biologist upon the initiation <br /> of construction to monitor construction activities until such time that the biologist <br /> determines that it is not needed. <br /> 37. The construction plans submitted for issuance of a building permit shall include the <br /> installation of an air filtration system on any heating, ventilation, and air conditioning <br /> (HVAC) system on the air intakes (i.e., outside air) serving the new residential units <br /> located on the project site. The air filtration system shall be a Minimum Efficiency <br /> Reporting Value (MERV) 13 air filtration system. <br /> 38. The construction plans submitted for issuance of a building permit shall clearly show that <br /> air intake vents on the proposed homes do not face the 1-580 freeway and they are <br /> located as far from 1-580 as practicable, subject to review and approval by the Director of <br /> Community Development. <br /> Engineering Department <br /> 39. The geotechnical report shall be peer-reviewed by the City's on-call geotechnical <br /> consultant. Prior to recordation of the parcel map, the project developer's civil engineer <br /> and/or geotechnical engineer shall satisfactorily address all comments and/or <br /> recommendations by the City's on-call consultant as determined by the City Engineer. <br /> 40. The applicant shall be responsible for the undergrounding of the overhead utility lines <br /> across the project frontage on Dublin Canyon Road. All utility lines shall be installed in <br /> conduit. Only PG&E switch enclosures or capacity banks can be installed above ground <br /> provided the units are screened with landscaping to the satisfaction of the Director of <br /> Community Development. <br /> 41. The applicant's design engineer shall submit the following documents with the first <br /> submittal of the improvement plans: <br /> a. Stormwater Requirement Checklist with an exhibit showing existing impervious <br /> area, impervious area to be removed and replaced, and new impervious area to <br /> be created. <br /> b. Water demand calculations. <br /> c. Sanitary sewer load calculations. <br /> d. Hydrologic and hydraulic calculations. <br /> Case No. PUD-114, 11300 Dublin Canyon City Council <br /> Page 9 of 26 <br />