My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
071916
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:28:00 PM
Creation date
7/13/2016 8:50:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lesley Lowe <br />September 24, 2014 <br />Page 3 of 3 <br />preliminary traffic loads onto Johnson Drive, we will recommend site access and circulation <br />standards, such as shared driveways. reciprocal access agreements, intersection Traffic controls, <br />such as traffic signals, secondary driveways or access roadways, and other guidelines. It is <br />expected that as developments are proposed, a detailed site access and circulation study would <br />be required. <br />Task 5 — Vehicle Miles of Travel Assessment <br />Proposed changes to the CEQA guidelines may require preparation of estimates of vehicle miles <br />of travel (VMT) for the proposed project. We will use available modeling tools, either the City of <br />Pleasanton travel demand model or the Alameda CTC model, to estimate VMT without and with <br />the project for the existing and cumulative conditions. As the CEQA guidelines are finalized, <br />additional information will be available on the recommended method to calculate VMT. <br />Task 6 — Documentation <br />Results of Tasks 1, 2, 4 and 5 will be incorporated into the transportation impact assessment to be <br />prepared under our original scope of work. Results of Task 3 will be summarized in a standalone <br />memorandum. <br />LEVEL OF EFFORT <br />Fehr & Peers can complete the above tasks for an additional fee of 332,220 under the terms and <br />conditions of our contract dated July 22, 2014. This fee includes one iteration of Task 3. The level <br />of effort for each additional permutation is noted in the attached fee schedule. Please contact <br />Kathrin Tellez at 925- 930.7100 if you have any questions. <br />Sincerely. <br />FEHR & PEERS <br />Kalhrin Tellez, AICP, PTP <br />Senior Associate <br />PP 9272 WC <br />
The URL can be used to link to this page
Your browser does not support the video tag.