My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
071916
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:28:00 PM
Creation date
7/13/2016 8:50:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEH R 'PEERS <br />1. Foothill Road /Stoneridge Drive <br />2. Stoneridge Drive /I.680 Southbound Ramps <br />3. Stoneridge Drive /I -680 Northbound Ramps <br />4. Stoneridge Drive /Johnson Drive <br />5. Commerce Drive /Johnson Drive <br />6. Park and Ride Lot /Johnson Drive <br />7. Stoneridge Drive /Franklin Drive <br />8. Dougherty Road /I -580 Westbound Ramps <br />9. Hopyard Road /I -580 Eastbound Ramps <br />10. Hopyard Road /Owens Drive <br />11. Johnson Drive /Owens Drive (north) <br />12. Johnson Drive /Owens Drive (south) <br />13. Stoneridge Drive /Hopyard Road <br />14. West Las Positas Boulevard /Hopyard Road <br />15. Stoneridge Drive /Hacienda Drive <br />A technical memorandum detailing the analysis assumptions, including a final list of recommended study <br />intersections will be submitted to City staff and the project team for review and comment prior to <br />completing the impact analysis. <br />Task 2 — Data Collection and Site Reconnaissance <br />This scope of work assumes that we will use the most recent intersection turning movement count data <br />available from the City, to be provided to us in Synchro files with the most current lane configurations, <br />traffic control and traffic signal timings. We have included new peak period traffic counts at up to five <br />intersections to capture locations that are not included in the City's database. We will conduct up to 8 <br />hours of field reconnaissance to spot check the intersection operation parameters, including lane <br />configurations and traffic signal timing parameters. We will review with City staff any necessary <br />modifications to the Synchro files prior to completing the impact analysis. <br />Task 3 — Impact Analysis <br />The intersection peak hour level of service at each study intersection will be calculated using the 2000 <br />Highway Capacity Manual method using Synchro software. Intersection turning movement forecasting <br />methods are discussed within each scenario. The impact analysis will be conducted for the following <br />scenarios: <br />
The URL can be used to link to this page
Your browser does not support the video tag.