My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
071916
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:28:00 PM
Creation date
7/13/2016 8:50:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />RUGGERI-JENSEN-AZAR ENGINEERS * PLANNERS 0 SURVEYORS <br />EXHIBIT "13" <br />COMPENSATION <br />City of Pleasanton (Client) shall compensate Ruggeri - Jensen -Azar (Consultant) for the performance <br />of the work described in Exhibit" A" and such additions as may he made hereto pursuant to <br />Paragraph 1I 01' Exhibit "A," as hereafter set forth. <br />1. Compensation <br />Compensation for this project will be on a Fixed Pee basis as follows: <br />A. Aerial 'topographic Map $14,200 <br />I3. Record Boundary $7,500 <br />C. Research Existing Utilities $2.500 <br />D. Existing ('onditions /Constraints Map $5,500 <br />E. Preliminary layout Plans <br />1. Stoneridge Drive /Johnson Drive $6,0011 <br />2. 1 -680 On -Ramp $7,500 <br />P. Preliminary Engineer's Opinion of Probable Construction Costs $5,000 <br />Total: $48,200 <br />11. Other Items <br />A. Compensation for Additional Services: <br />Compensation for additional services will be made in accordance with the Rate and <br />Expense Schedules per Exhibit "13 -1 " attached hereto. <br />13. Compensation for Reproduction Work: <br />Reproduction work will be pilled at C'onsultant's cost plus 15% per the attached Exhibit <br />C. Wage Increase: <br />The fee for any work under Paragraph 1 of Exhibit "A" will be performed on a fixed Ice or <br />at an hourly rate per I ahihil "11 -1" up to December 31, 2015. The Ice for work which has <br />been authorized and could not be reasonably completed prior to December 31, 2015 shad] <br />annually on January I be increased proportionately to the increases in costs incurred by <br />Ruggeri - Jensen -Az:Lr for labor and expenses. The maximum increase on compensation <br />alter December 31, 2015 shall not exceed 10% per year Ibr services covered by this Scope <br />of Work. <br />(i UIFIMVYIIIPU \R V I rl P1011"1.1 I ANN' N.' I"laI R'I)i 11 II IIIIi,"i poi ixk <br />4 <br />I CH JA, b:adi( r.nl <br />
The URL can be used to link to this page
Your browser does not support the video tag.