Laserfiche WebLink
overflow. This plan shall be subject to the review and approval of the City Engineer <br /> prior to the issuance of a subdivision grading permit. <br /> 87.Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of a <br /> dedicated public street or public service easement approved by the City Engineer <br /> shall be privately maintained by the property owners or through an association <br /> approved by the City. <br /> 88.AII existing drainage swales that are filled shall have subdrains installed unless <br /> otherwise approved by the City Engineer and the developer's soils engineer. All <br /> subdrains shall have cleanouts installed at the beginning of the pipe. The end of the <br /> pipe shall terminate in a storm drain or other storm drain outfall, subject to the <br /> approval of the City Engineer. The applicant's engineer shall submit a final subdrain <br /> location map to the City Engineer prior to acceptance of the public improvements. It <br /> shall be the responsibility of the homeowner to relocate a subdrain, f during the <br /> excavation of a pool or other subsurface structure, a subdrain is encountered. All <br /> owners within the subdivision shall receive notice of the presence of these <br /> subdrains. The City Attorney shall approve said notice. <br /> 89.The minimum grade for the gutter flowline shall be set at one percent where <br /> practical, but not less than .75% unless otherwise approved by the City Engineer. <br /> 90.The improvement plans for this development shall contain signage and striping plans <br /> that are subject to the approval of the City Traffic Engineer. <br /> 91.The curb and gutter along the street shall have a subdrain installed at either the <br /> back of the curb or lip of gutter at the discretion of the City Engineer. This detail <br /> shall be shown on the improvement plans. Said drains shall be connected to the <br /> storm drain system or drained by other means acceptable to the City Engineer. <br /> 92.The property owner/developer shall deposit a bond with the City to ensure <br /> completion of any required improvements. This bond shall be in a standard form <br /> approved by the City Attorney and shall be in an amount satisfactory to the City <br /> Engineer. The City Engineer may waive this requirement if the required <br /> improvements have been satisfactorily installed prior to approval of the map. <br /> Building and Safety Division <br /> 93.Prior to issuance of building or demolition permits, the applicants shall submit a <br /> waste management plan to the Building and Safety Division. The plan shall include <br /> the estimated composition and quantities of waste to be generated and how the <br /> applicants intends to recycle at least seventy-five percent (75%) of the total job site <br /> construction and demolition waste measured by weight or volume. Proof of <br /> compliance shall be provided to the Chief Building Official prior to the issuance of a <br /> final building permit. During demolition and construction, the applicants shall mark <br /> all trash disposal bins "trash materials only" and all recycling bins "recycling <br /> PUD-116, Beriogar Page 20 <br />