My WebLink
|
Help
|
About
|
Sign Out
ORD 2145
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
6/14/2016 3:00:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/7/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2145
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23. All excess soil from the site shall be off-hauled from the site and disposed of in a lawful <br /> manner. Unless otherwise approved by the Director of Community Development, no <br /> stockpiling of dirt on this site shall occur. <br /> 24. The applicant/developer shall implement construction best management practices to <br /> reduce construction noise, including: <br /> a. Locate stationary construction equipment as far from adjacent occupied buildings as <br /> possible. <br /> b. Select routes for movement of construction-related vehicles and equipment so that <br /> noise-sensitive areas, including residences and outdoor recreation areas, are avoided <br /> as much as possible. Include these routes in materials submitted to the City of <br /> Pleasanton for approval prior to the issuance of building permits. <br /> c. All site improvements and construction activities shall be limited to the hours of <br /> 8:00 a.m. to 5:00 p.m., Monday through Friday. In addition, no construction shall be <br /> allowed on State and federal holidays, Saturdays, or Sundays. The Community <br /> Development Director may allow earlier"start times"for specific construction activities <br /> (e.g., concrete foundation/floor pouring), if it can be demonstrated to the satisfaction <br /> of the Community Development Director that the construction and construction traffic <br /> noise will not affect nearby residents. Prior to construction, the hours of construction <br /> shall be posted on site. <br /> d. All construction equipment must meet DMV and City noise standards and shall be <br /> equipped with muffling devices. <br /> e. Designate a noise disturbance coordinator who will be responsible for responding to <br /> complaints about noise during construction. The telephone number of the noise <br /> disturbance coordinator shall be conspicuously posted at the construction site and <br /> shall be provided to the City of Pleasanton. Copies of the construction schedule shall <br /> also be posted at nearby noise sensitive areas. <br /> f. Construction activities conducted on the subject property shall not exceed 86 dBA at <br /> any point outside of the property plane of the subject property (Pleasanton Municipal <br /> Code Section 9.04.100.B.). <br /> These requirements shall be printed on the construction plans to the satisfaction of the <br /> Director of Community Development. <br /> 25. Rain gutters shall discharge into landscaping planter areas where feasible. These details <br /> shall be shown on the plans submitted to the Building and Safety Division for plan check <br /> and are subject to the review and approval of the Director of Community Development prior <br /> to building permit issuance. <br /> Case No. PUD— 112/1027 Rose Avenue Planning Commission <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.