My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
060716
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:10:09 PM
Creation date
6/1/2016 8:52:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2016
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Acceptance Form A-Project Kickoff(Milestone 1) <br /> Purpose <br /> The purpose of the Project Kickoff Acceptance Form is to confirm that the project kickoff has <br /> occurred and the following deliverables are completed. <br /> Deliverables <br /> • Contract signature and execution <br /> • Planning of the project kickoff/discovery session <br /> • Resourcing and scheduling for the discovery phase <br /> • Preliminary review of the requirements by the project team prior to the first meeting <br /> • Creation of live production environment,which includes at a minimum: <br /> — Setup of Customer's production environment on the cloud <br /> — System setups including backups and retentions <br /> — Database security setup <br /> — Setup of the monitoring tools and systems on Customer's database <br /> — Basic configuration of the database with Parks and Rec Modules <br /> The work was completed on _ and accepted by Customer. <br /> Accepted by: <br /> (The City of Pleasanton): Date: <br /> Title: <br /> (PerfectMIND): Date: <br /> Title: <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.