My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
051716
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:50:45 PM
Creation date
5/12/2016 8:34:48 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/17/2016
DESTRUCT DATE
15Y
DOCUMENT NO
15
Document Relationships
15 ATTACHMENT 2 EXHIBIT B - Project Narrative
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
15 ATTACHMENT 2 EXHIBIT B - Proposed Plans
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
15 ATTACHMENT 2 EXHIBIT B - Traffic Study
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
15 ATTACHMENT 2 EXHIBIT B - Tree Reports
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
15 ATTACHMENT 4 EXHIBIT D
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\051716
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
signal timing (e.g., extending the left-turn green time when the vehicle queue reaches a certain <br /> length). The signal timing would be managed by the City Traffic Engineer. <br /> Transit, Bike, and Pedestrian Access <br /> Similar to the approved plan, the existing Wheels bus stop and BART kiss-n-ride turnout along <br /> Stoneridge Mall Road would be relocated to the northwest in front of the BART garage. <br /> Existing and proposed sidewalks along Stoneridge Mall Road and Embarcadero Court would <br /> provide pedestrian access to the project sites. A new feature of the modified project is a <br /> pedestrian bridge connecting the Workday garage to the existing bridge between the BART <br /> station and BART garage. Workday would allow the public to use this bridge and the elevators <br /> and staircase in the parking garage. The existing exterior staircase at the BART station <br /> bridge, currently only used for emergency egress, would be opened for general use and a new <br /> plaza area would be created between the staircase and BART garage. A pedestrian/bicycle <br /> promenade along the east side of the BART garage would connect the plaza to Stoneridge <br /> Mall Road. Bicycle access would also be provided on the west and north sides of the BART <br /> garage. There is an existing crosswalk on Stoneridge Mall Road in front of the BART garage <br /> that would be relocated slightly to align with the new pedestrian/bicycle promenade. A new <br /> sidewalk would be constructed from this crosswalk on the south side of Stoneridge Mall Rd. <br /> and into the Nordstrom property, which would provide a continuous sidewalk from the BART <br /> station to the Nordstrom building. <br /> Police Service Center <br /> Similar to the approved project, Workday would construct a small addition and remodel the <br /> ground level of the BART parking garage to create a joint BART and City of Pleasanton police <br /> service center. The service center would be located in the southwest corner of the garage and <br /> the front elevation would be modified by adding a small addition and glass storefront windows. <br /> The space would serve as a limited-use facility to support law enforcement operations and <br /> ancillary services for public safety in the north end of Pleasanton. The applicant has <br /> collaborated with Police Department staff to ensure the design reflects Police Department <br /> needs. A drive aisle and parking space for BART police staff would be installed along the west <br /> side of the BART garage that would connect to the adjacent office parking lot at <br /> 6000 Stoneridge Mall Road. Six parking spaces would be added in front of the garage for <br /> Pleasanton Police staff and customers. The applicant would install related improvements in <br /> front of the BART garage, including new landscaping, concrete seat walls, and signage. Staff <br /> believes that the proposed changes would improve the appearance of the garage and that the <br /> police service center would be a valuable public facility that enhances police services in the <br /> Stoneridge Mall and BART station area. The Development Agreement requires that the police <br /> service center be constructed concurrently with the rest of the Workday project. <br /> Signage <br /> In addition to the Workday name/logo on the northern perforated panel of the garage, wall- <br /> mounted signs are shown on the south and west elevations of the office building. Staff finds <br /> the general location, number, and size of the signs to be acceptable. Staff anticipates that <br /> ground-mounted project identification and directional monument signs would also be proposed. <br /> The applicant would install signage at the BART garage including BART, police, and <br /> wayfinding signs in front of the garage, a parking space vehicle counter (indicating how many <br /> parking spaces are available in the BART garage) on the front wall of the BART garage, and <br /> BART and "Welcome to Pleasanton" signs behind the garage in the plaza area. Staff finds the <br /> PUD-104-1M/PUD-81-22-15M, 6110/6120-6160 Stoneridge Mall Road Planning Commission <br /> Page 11 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.