My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
051716
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:52:10 PM
Creation date
5/11/2016 4:19:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/17/2016
DESTRUCT DATE
15Y
DOCUMENT NO
16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C2RLSDN <br /> Li FlaN8u 2:\;`' <br /> k. Collect and check record drawing information as furnished by the <br /> Contractor, furnish information to the designer for preparation of record <br /> drawings. <br /> I. Neither the professional activities of the CONSULTANT, nor the presence <br /> of the CONSULTANT or its employees and subconsultants at a <br /> construction/project site, shall impose any duty on the CONSULTANT, nor <br /> relieve the Contractor of its obligations, duties and responsibilities <br /> including, but not limited to, construction means, methods, sequence, <br /> techniques or procedures necessary for performing, superintending and <br /> coordinating the Work in accordance with the Contract Documents and <br /> any health or safety precautions required by any regulatory agencies. <br /> CONSULTANT and its personnel have no authority to exercise any control <br /> over any construction contractor or its employees in connection with their <br /> work or any health or safety programs or procedures. CITY agrees that <br /> the Contractor shall be solely responsible for jobsite and worker safety <br /> and warrants that this intent shall be carried out in the CITY'S contract <br /> with the Contractor. CITY also agrees that the Contractor shall defend and <br /> indemnify the CITY and CONSULTANT. CITY also agrees that the CITY <br /> and CONSULTANT shall be made additional insureds under the General <br /> Contractor's policies of general liability insurance. <br /> 5. POST CONSTRUCTION PHASE <br /> After acceptance of each construction contract, CONSULTANT will prepare a <br /> Construction Completion Report that will include: <br /> e Summary of scope, cost, and schedule changes and the reason for the <br /> changes <br /> e Summary of project costs <br /> • Comprehensive Project Records (per Caltrans requirements). <br /> Consulting Services Agreement between April 27, 2016 <br /> City of Pleasanton and Carlson Management, Inc. Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.