Laserfiche WebLink
The Lighting and Landscaping Assessment process, once assessments are updated to <br /> meet current maintenance requirements, will provide an efficient and effective means <br /> for maintenance to be assured. <br /> DISCUSSION <br /> The City currently has five Lighting and Landscape Maintenance Districts which are <br /> being assessed. <br /> When the properties within the districts are assessed, the fee is included on the county <br /> property tax bill. At that time, the County adds 1.7% to the base assessment as an <br /> administration fee. The assessments on the City parcels located within Ponderosa-Del <br /> Prado, Bonde Ranch, Oak Tree Farm, and Moller Ranch Districts will not include the <br /> 1.7% county administration fee as the Finance Department will transfer the money from <br /> the General Fund into the specific district fund without involving the County. <br /> The Engineer's budget for each district includes a reserve fund to provide for the <br /> replacement of assets such as decorative entry walls, signage, light fixtures, etc. <br /> Replacement costs have been calculated for the eventual replacement of the assets of <br /> each district. <br /> Landscape Maintenance District 1984-1, Ponderosa-Del Prado <br /> The Ponderosa Homes subdivision (L & L District 1984-1) has been in place for thirty- <br /> two (32) years. Maintenance in this District includes the care of masonry walls, trees, <br /> shrubbery, groundcover and irrigation systems along Paseo Santa Cruz between Corte <br /> Santa Maria and Corte Pacifica. <br /> The District has reduced water use by the required 25% in 2015-16 and will continue to <br /> meet City water use reduction requirements. <br /> The overall assessments for the coming year for District 1984-1 (Ponderosa-Del Prado) <br /> will remain at $5,813.32. This amounts to $16.90 per parcel. The $5,813.32 is not <br /> sufficient to fund the maintenance of all common areas along Paseo Santa Cruz, <br /> including water and electrical costs, county administration fees, city administration fees, <br /> replacement of plantings, irrigation systems, masonry walls, and other district <br /> improvements. The Engineer's Report projects that $5,795.72 will be required from the <br /> reserve fund to cover projected maintenance costs. It is likely that an increase in the <br /> annual assessment will be necessary in the future in order to maintain the maintenance <br /> standards of the District. <br /> With the assessment of one city-owned parcel ($16.62), and the cost of maintenance for <br /> the "general benefit" area along the Arroyo ($9,703.00) that was at one time included in <br /> this District, the City will be responsible for$9,719.62 of maintenance within the District. <br /> Page 4 of 7 <br />