My WebLink
|
Help
|
About
|
Sign Out
RES 16837
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2016
>
RES 16837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 1:58:57 PM
Creation date
4/18/2016 1:26:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/15/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
16837
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
issuance of permits by the Building and Safety Division. Such transformers shall be <br />screened by landscaping to the satisfaction of the Director of Community Development. <br />All transformers shall be shown on the plans submitted for issuance of building permits. <br />15. Prior to installation, the applicant shall submit a sample and mock -up of the stucco wall <br />finish for review and approval by the Director of Community Development. <br />16. Prior to issuance of a building permit, the applicant shall submit a detail and mock -up of <br />the balcony railing. The balcony railing shall be subject to the review and approval by <br />the Director of Community Development. <br />17. The applicant shall revise the plans submitted for building permit to show the removal of <br />the proposed monument sign from the project. <br />18. The applicant shall revise the plans submitted for building permit to reduce the width of <br />the entrance driveway and curb cut from 25 feet to 20 feet. <br />19. The applicant shall revise the plans submitted for a grading /site improvement permit to <br />show the construction of an eight- foot -tall solid wood fence along the entirety of the <br />northern property line. The design of the fence shall be subject to the review and <br />approval by the Director of Community Development. The fence shall be installed prior <br />to issuance of a building permit for the commercial /office building. <br />20. Prior to issuance of a building permit, the applicant shall submit a revised grading plan <br />that includes grading and retaining wall information for the entire project site. <br />21. Prior to issuance of a building permit, the applicant shall submit a payment in the <br />amount of $18,600 to the City's Urban Forestry Fund. <br />22. Prior to issuance of a building permit, the applicant shall contribute $2,500 per new unit <br />to the Bernal Property Reserve Fund. <br />23. The entirety of the approximately 732 - square -foot ground -floor retail space shall be <br />leased only to a retail or restaurant tenant. <br />Traffic Engineering Division <br />24. The proposed raised planter on Spring Street adjacent to the retail building shall be a <br />maximum height of 3 feet, including plantings, for sight distance purposes. <br />Engineering Department <br />25. Prior to final inspection, each of the residential units and the landscaping irrigation shall <br />each connect independently by a separate water meter and service lateral to the City <br />water main located within Spring Street. <br />P16 -0588, 273 Spring Street City Council <br />Page 4 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.