Laserfiche WebLink
These requirements shall be printed on the construction plans to the satisfaction of the <br />Director of Community Development. <br />23. The project shall comply with the State of California Model Water Efficient Landscape <br />Ordinance and Bay Friendly Basics Landscape Checklist. Prior to issuance of a Building <br />Permit, the applicant shall submit the following documentation to the Planning Division: <br />a. Landscape Documentation Package, which includes date; project applicant/contact <br />information; project address; total landscape area; project type (new, rehabilitated, <br />public, private, cemetery, homeowner - installed); water supply type (potable, <br />recycled, well, greywater, combination of potable /greywater); and applicant <br />signature /date with the statement that "I agree to comply with the requirements of <br />the prescriptive compliance option of the Water Efficient Landscape Ordinance." <br />b. Landscape Plan documenting: incorporation of compost at a rate of at least 4 cubic <br />yards /1,000 square feet; compliance with the plant material criteria; compliance with <br />the turf criteria; compliance with the irrigation system criteria; and installation of <br />private sub - meters if the project is non - residential with a landscape area of <br />1,000 square feet or greater <br />24. The new homes shall be constructed to allow for future installation of a Photovoltaic (PV) <br />system and solar water heating systems. The project applicant/developer shall comply <br />with the following requirements for making the proposed residential units photovoltaic - <br />ready and solar- water - heating- ready: <br />a. Electrical conduit and cable pull strings shall be installed from the roof /attic area to <br />the building's main electrical panels; <br />b. An area shall be provided near the electrical panel for the installation of an "inverter" <br />required to convert the direct current output from the photovoltaic panels to <br />alternating current; <br />c. Engineer the roof trusses to handle an additional load as determined by a structural <br />engineer to accommodate the additional weight of a prototypical photovoltaic system <br />beyond that anticipated for roofing; <br />d. Plumbing shall be installed for solar -water heating; and <br />e. Space shall be provided for a solar- water - heating tank. <br />These measures shall be shown on the building permit plan set submitted to the Director <br />of Community Development for review and approval before issuance of the first building <br />permit. <br />25. Pre - Construction Bird Survey: If project construction - related activities takes place during <br />the nesting season (February 1 through September 15), prior to issuance of a building or <br />grading permit, preconstruction surveys for nesting passerine birds and raptors (birds of <br />prey) within the project site and the surrounding area of influence shall be conducted by a <br />qualified biologist prior to the commencement of the tree removal or site grading activities. <br />If any bird listed under the Migratory Bird Treaty Act is found to be nesting within the <br />project site or within the area of influence, an adequate protective buffer zone shall be <br />established by a qualified biologist to protect the nesting site. This buffer shall be a <br />