Laserfiche WebLink
18. The garages for the new homes shall have automatic opening sectional roll -up garage <br />doors. <br />19. Water conservation devices such as low -flow faucets, toilets, shower fixtures, etc. shall be <br />installed as part of the project. The devices shall be indicated on the plans submitted for <br />the issuance of a building permit. <br />20. Only recycled water shall be used on the site during the grading and construction periods, <br />and this specification shall be included on all grading plans and other construction <br />documents. <br />21. The project shall comply with the current City /Pleasanton Garbage Service recycling and <br />composting programs. <br />22. The applicant/developer shall implement construction best management practices to <br />reduce construction noise, including: <br />a. Locate stationary construction equipment as far from adjacent occupied buildings as <br />possible. <br />b. Select routes for movement of construction- related vehicles and equipment so that <br />noise - sensitive areas, including residences and outdoor recreation areas, are <br />avoided as much as possible. Include these routes in materials submitted to the City <br />of Pleasanton for approval prior to the issuance of building permits. <br />c. All site improvements and construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Friday. In addition, no construction shall be <br />allowed on State and federal holidays, Saturdays, or Sundays. The Community <br />Development Director may allow earlier "start times" for specific construction <br />activities (e.g., concrete foundation /floor pouring), if it can be demonstrated to the <br />satisfaction of the Community Development Director that the construction and <br />construction traffic noise will not affect nearby residents. Prior to construction, the <br />hours of construction shall be posted on site. <br />d. All construction equipment must meet DMV and City noise standards and shall be <br />equipped with muffling devices. <br />e. Designate a noise disturbance coordinator who will be responsible for responding to <br />complaints about noise during construction. The telephone number of the noise <br />disturbance coordinator shall be conspicuously posted at the construction site and <br />shall be provided to the City of Pleasanton. Copies of the construction schedule <br />shall also be posted at nearby noise sensitive areas. <br />f. Construction activities conducted on the subject property shall not exceed 86 dBA at <br />any point outside of the property plane of the subject property (Pleasanton Municipal <br />Code Section 9.04.100.B.). <br />