Laserfiche WebLink
47. The applicant/project developer's contractor shall protect Arroyo del Valle Creek <br />during all construction activities. A $15,000 bond shall be posted with the City <br />Engineer to ensure compliance with this requirement. Protection measures shall <br />be described in detail on the on -site grading and utility improvement plans and <br />any other construction or building plans to the satisfaction of the City Engineer <br />prior to the start of construction. <br />48. Any damage to existing street improvements, including the central island at the <br />intersection of Rose Avenue and White Stable Drive (the roundabout), during <br />construction on the subject property shall be repaired to the satisfaction of the <br />City Engineer at full expense to applicant/project developer and includes but is <br />not limited to slurry seal, overlay, restoration of landscaping and irrigation <br />system, signing, striping, pavement marking, concrete or street reconstruction if <br />deemed warranted by the City Engineer. <br />49. The recorded deed of sale for lots 14, 15 and 16 shall include a disclosure that <br />lots 17, 18 and 19 will be constructed in a future phase, Phase ll. Wording for this <br />disclosure shall be written in simple /plain language, shall be submitted to the City <br />Attorney for review and approval before City Council approval of the final map, <br />and shall be recorded over lots 14, 15, and 16 by separate instrument. <br />50. The on -site grading and utility improvement plans shall clearly show all Phase <br />work to the satisfaction of the City Engineer. <br />51. The applicant/project developer's engineer shall submit as -built drawings of off - <br />site sewer & water Improvement plans, on -site grading and utility improvement <br />plans and joint trench plans in AutoCAD 2010 and pdf format acceptable to the <br />City Engineer prior to the release of the performance bond and labor and <br />materials bond. <br />Traffic Division <br />52. Comprehensive traffic control measures shall be implemented during construction, <br />including scheduling of major truck trips and deliveries, to avoid peak travel hours. <br />If necessary, as determined by the Traffic Engineer, proper lane closure <br />procedures such as flagger stations, signage, cones, and other warning devices <br />shall be implemented during construction. <br />Landscapinci <br />53. A final landscape and irrigation plan shall be submitted to and approved by <br />Director of Community Development as part of the building permit plan set prior to <br />issuance of a building permit. Said landscape plan shall be detailed in terms of <br />species, location, size, quantities, and spacing. Plant species shall be of drought - <br />tolerant nature and suitable for reclaimed water, and the irrigation design shall <br />9 of 27 <br />