Laserfiche WebLink
38. The on -site grading and utility improvement plans shall include a north -south cross <br />section through Lynn Drive adjacent to lot 9. The cross section shall start from the <br />centerline of the Arroyo del Valle and end at a point on the lot 9 pad. At a <br />minimum, the cross section shall show the AC path, bioretention facility (BMP 1), <br />street section, and the creek bank setbacks for non - habitable and habitable <br />structures projected from the toe of the creek bank to the existing or proposed <br />ground surfaces as recommended in the Updated Seismic Hazards Evaluation <br />prepared by ENGEO and dated October 21, 2013. <br />39. Prior to the first submittal of the improvement plan review, the project developer <br />shall provide written verification from the County of Alameda County Administrator <br />that the County of Alameda County Administrator approves the proposed <br />improvements and public sanitary sewer and water easements as depicted on their <br />property, APN 946- 3485 -1 -7, on the Preliminary Off -Site Sewer & Water <br />Improvement plans prepared by Ruggeri- Jensen -Azar and dated January 2016. <br />40. The applicant/project developer's civil engineer or land surveyor shall prepare and <br />submit the grant of public sanitary sewer and water easements (deed, plats, and <br />legal descriptions) required by the off -site sewer & water Improvement plans to the <br />City Engineer for review and approval prior to the approval of the off -site sewer & <br />water Improvement plans, on -site grading and utility improvement plans. <br />41. The applicant/project developer shall pay all costs to prepare and record the grant <br />of public sanitary sewer and water easements required by the off -site sewer & <br />water Improvement plans. <br />42. The project developer's engineer shall submit off -site sewer & water <br />improvement plans concurrently with the on -site grading and utility improvement <br />plans. All plans shall be at an equal state of completion. <br />43. The offsite sanitary sewer main and water main shall be a size acceptable to the <br />City Engineer and Director of Operations. The City will reimburse the developer <br />in an amount determined by the City Engineer for the design and construction of <br />the City's share of the off -site sewer and water improvements per the <br />reimbursement agreement approved by the City Council. <br />44. The precast wall and its foundation along Rose Avenue shall not encroach onto <br />Alameda County Fairground's property. <br />45. The applicant/project developer shall convey Parcel A by separate instrument to <br />the homeowners association. The homeowners association shall maintain the <br />landscaping, creek bank, irrigation, fencing, and the public trail and all <br />appurtenances within Parcel A. <br />46. The applicant/project developer shall dedicate a public trail easement on Parcel <br />A on the final map. <br />8 of 27 <br />