My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
041916
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:41:28 PM
Creation date
4/13/2016 11:53:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />CITY COUNCIL AGENDA REPORT <br />PLEASANTON, <br />April 19, 2016 <br />Engineering <br />TITLE: APPROVE A PURCHASE ORDER WITH PLAYCRAFT DIRECT, INC. IN THE <br />AMOUNT OF $361,771.41 TO MANUFACTURE AND INSTALL THE <br />BERNAL COMMUNITY PARK PHASE 2 PLAYGROUND EQUIPMENT AND <br />WOOD FIBER SURFACING <br />SUMMARY <br />The proposed purchase order with Playcraft Direct, Inc. (Playcraft) is to manufacture and <br />install the playground equipment and wood fiber surfacing at the Bernal Community Park <br />Phase 2 playground. The design of the playground equipment was separated from the <br />overall project to allow for greater City control over the design process, to allow more time <br />to determine the final design, and to achieve costs savings by contracting directly with the <br />playground manufacturer. The design of the equipment included three separate play <br />areas adjacent to the proposed plaza and play fields at the park. The upper play area will <br />be dedicated to 5 -12 year -olds, the middle play area will accommodate both 2 -5 and 5- <br />12 year -olds, and the bottom play area will be dedicated to 2 -5 years -olds. The play <br />equipment was designed around a nature theme and includes a zipline, slides, towers, <br />climbing structures, spinners, at -grade play elements, and shade structures. <br />RECOMMENDATION <br />1. Approve a purchase order with Playcraft Direct, Inc. in the amount of $361,771.41 to <br />manufacture and install the Bernal Community Park Phase 2 playground equipment <br />and wood fiber surfacing. <br />2. Authorize the use of $361,771.41 from the Bernal Community Park CIP fund, CIP <br />No.017045. <br />3. Authorize the City Manager to execute the purchase order with Playcraft in the amount <br />of $361,771.41. <br />FINANCIAL STATEMENT <br />Funds are budgeted and available in the Bernal Community Park CIP fund, CIP <br />No. 017045 for the playground equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.