Laserfiche WebLink
e. The carrying capacity of the access route(s) shall be 69,000 pounds under all <br />weather conditions. <br />f. Designated construction material storage and construction worker parking shall not <br />obstruct the emergency vehicle access route(s). <br />g. On -site fire hydrants shall be in service. Fire hydrants shall be flushed and all valves <br />open. <br />Engineering Department - Urban Stormwater <br />107. The project shall comply with the "Alameda Countywide NPDES Permit #CAS612008 <br />dated October 14, 2009 and amendments to this permit" issued the by California <br />Regional Water Quality Control Board, San Francisco Bay Region, a copy of which is <br />available at the Community Development Department, Public Works /Engineering <br />section at City offices, Alameda County Clean Water Program and at State Water <br />Board: <br />- ( http:// www. waterboards. ca. gov /sanfranciscobay/water_issues /programs /stormwater <br />/Municipalfndex.shtml.; and <br />- http: //www.waterboards .ca.gov /sanfranciscobay/board _info /agendas /2007 /march /ala <br />meda %20final %20order %20x2- 2007 -0025. pdf) <br />108. The project shall also comply with the "Construction General Permit" by the Califomia <br />Regional Water Quality Control Board, San Francisco Bay Region. <br />http: / /www.waterboards.ca.gov /water issues / programs /stormwater /construction.shtml <br />A. Design Requirements <br />109. The NPDES Permit design requirements include, but are not limited to, the following: <br />a) Source control, sight design measures, and design and implementation of <br />stormwater treatment measures are required when commercial, industrial or <br />residential development creates and replaces 10,000 square feet or more of <br />impervious surface, including roof area, streets and sidewalk. <br />b) Hydro - modification standards are required when a new development or <br />redevelopment project creates and replaces total impervious area of one acre or <br />more. <br />c) The NPDES Permit requires a proactive Diazinon pollutant reduction plan (aka <br />Pesticide Plan) to reduce or substitute pesticide use with less toxic alternatives. <br />d) The NPDES Permit requires complying with the Copper Pollutant Reduction Plan <br />and the Mercury Pollutant Reduction Plan. <br />P14 -0124, P14 -0125, and PUD- 107/377 St. Mary Street Planning Commission <br />19 of 26 <br />