My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
011916
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 4:18:10 PM
Creation date
1/13/2016 4:18:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
96. At the time of building permit plan submittal, the applicant shall submit a final grading <br /> and drainage plan prepared by a licensed civil engineer depicting all final grades and <br /> on-site drainage control measures to prevent stormwater runoff onto adjoining <br /> properties. <br /> 97. Prior to issuance of a business license, the applicant shall contact the Building and <br /> Safety Division and the Fire Marshal to ensure that the proposed use of the tenant <br /> space meets Building and Fire Code requirements. If required, the applicant shall <br /> obtain all appropriate City permits. <br /> 98. Prior to issuance of building or demolition permits, the applicant shall submit a waste <br /> management plan to the Building and Safety Division. The plan shall include the <br /> estimated composition and quantities of waste to be generated and how the project <br /> developer intends to recycle at least 75 percent of the total job site construction and <br /> demolition waste measured by weight or volume. Proof of compliance shall be provided <br /> to the Chief Building Official prior to the issuance of a final building permit. During <br /> demolition and construction, the project developer shall mark all trash disposal bins <br /> "trash materials only" and all recycling bins "recycling materials only." The project <br /> developer shall contact Pleasanton Garbage Service for the disposal of all waste from <br /> the site. <br /> Livermore-Pleasanton Fire Department <br /> 99. The project developer shall keep the site free of fire hazards from the start of lumber <br /> construction until the final inspection. <br /> 100. Prior to any construction framing, the project developer shall provide adequate fire <br /> protection facilities, including, but not limited to a water supply and water flow in <br /> conformance to the City's Fire Department Standards able to suppress a major fire. <br /> 101. All fire sprinkler system water flow and control valves shall be complete and serviceable <br /> prior to final inspection. Prior to the occupancy of a building having a fire alarm system, <br /> the Fire Department shall test and witness the operation of the fire alarm system. <br /> 102. All commercial, industrial, and multi-family residential occupancies shall have valve <br /> tamper and water flow connected to an Underwriters Laboratory (UL) listed Central <br /> Station Service. Fire Department plan check includes specifications, monitoring <br /> certificate(s), installation certificate and alarm company U.L. certificate. Fire alarm <br /> control panel and remote annunciation shall be at location(s) approved by the Fire <br /> Prevention Bureau. All systems shall be point identified by individual device and <br /> annunciated by device type and point. <br /> 103. The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire <br /> mains and fire hydrant locations only. Plan check comments and approvals DO NOT <br /> INCLUDE: <br /> P14-0124, P14-0125, and PUD-107/377 St. Mary Street Planning Commission <br /> 17 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.