My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
011916
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 4:18:10 PM
Creation date
1/13/2016 4:18:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notwithstanding the foregoing, the State of California's Green Building Standards Code, <br /> "CALGreen", as amended, shall also apply. <br /> a. The green building measures shall be shown on one of the first two pages of the <br /> plans submitted for issuance of a building permit. Each point identified shall have a <br /> notation indicating the sheet the point can be found, and each sheet shall note <br /> where the point is located. All proposed green building measures shall be shown <br /> throughout the plan set, as appropriate, as determined by the Director of Community <br /> Development. <br /> b. A special inspection by from the Planning Division shall be coordinated with regards <br /> to landscaping, irrigation, and exterior materials. All of the green building measures <br /> indicated on the approved checklist shall be inspected and approved by either the <br /> City of Pleasanton, a third party rater, or the applicants shall provide written <br /> verification by the project engineer, architect, landscape architect, or designer. <br /> 50. The new residences shall be constructed to allow for future installation of a Photovoltaic <br /> (PV) system and solar water heating systems. The project applicant shall comply with <br /> the following requirements for making the dwelling photovoltaic-ready and solar-water- <br /> heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic area to <br /> the building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an "inverter" <br /> required to convert the direct current output from the photovoltaic panels to <br /> alternating current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a structural <br /> engineer to accommodate the additional weight of a prototypical photovoltaic system <br /> beyond that anticipated for roofing. <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-heating tank. <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Director of Community Development for review and approval before issuance of the first <br /> building permit. <br /> 51. Only gas fireplaces, pellet fueled wood heaters or EPA certified wood-burning <br /> appliances may be installed. <br /> 52. The applicants shall provide garage doors on the garages of the houses covered by this <br /> approval. The door design and material shall be to the satisfaction of the Director of <br /> Community Development. <br /> P14-0124, P14-0125, and PUD-107/377 St. Mary Street Planning Commission <br /> 11 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.