My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
011916
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 4:18:10 PM
Creation date
1/13/2016 4:18:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Division <br /> 42. To the extent permitted by law, the applicant shall defend (with counsel reasonable <br /> acceptable to the City), indemnify and hold harmless the City, its City Council, its <br /> officers, boards, commissions, employees and agents from and against any claim <br /> (including claims for attorney's fees), action, or proceeding brought by a third party <br /> against the indemnified parties and the applicant to attack, set aside, or void the <br /> approval of the project or any permit authorized hereby for the project, including (without <br /> limitation) reimbursing the City its attorney's fees and costs incurred in defense of the <br /> litigation. The City may, in its sole discretion, elect to defend any such action with <br /> attorneys of its choice. <br /> 43. The applicant shall obtain all required City permits prior to construction. <br /> 44. The applicant shall work with the Pleasanton Unified School District (PUSD) to develop <br /> a program to offset this project's long term effect on school facility needs in Pleasanton <br /> in addition to the school impact fees required by State law. This program shall be <br /> designed to fund school facilities necessary to offset this project's reasonably related <br /> effect on the long-term need for expanded school facilities. The method and manner for <br /> the provision of these funds and/or facilities shall be approved by the PUSD and in <br /> place prior to building permit issuance. Written proof of compliance with this condition <br /> shall be provided by the applicant to the City, on a form generated by the PUSD, prior to <br /> building permit issuance. <br /> 45. The development shall comply with the current City of Pleasanton's Garbage Service's <br /> recycling and composting programs. <br /> 46. The electrical plan for the home shall provide telecommunications infrastructure <br /> consistent with state-of-the-art methods (e.g. cabling for DSL, broadband, or wireless <br /> service, wiring for total room access, etc.) in effect at the time that building permit(s) are <br /> issued. The plan shall be part of the building permit plan set. <br /> 47. A minimum of one appliance or system meeting Energy Star standards shall be installed <br /> as part of the project. The proposed appliances shall be stated on the plans submitted <br /> for the issuance of a building permit. <br /> 48. Water conservation devices such as low-flow faucets, toilets, shower fixtures, etc., shall <br /> be installed as part of the project. The water conservation devices shall be stated on <br /> the plans submitted for the issuance of a building permit. <br /> 49. The applicant/building developer shall submit a final list of the green building measures <br /> used in the design of the residences covered by this approval to the Planning Division <br /> for the review and approval by the Director of Community Development prior to the <br /> building permit submittal. The single-family residences shall be designed to achieve a <br /> "certified rating" of a minimum of 50 total points, achieving at least the minimum points <br /> in each category, using BuildltGreen's current GreenPoints rating system. <br /> P14-0124, P14-0125, and PUD-107/377 St. Mary Street Planning Commission <br /> 10 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.