Laserfiche WebLink
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures Implementation Monitoring Monitoring and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> Open Space Maintenance District to ensure the <br /> implementation of routine maintenance measures for <br /> fire protection purposes. <br /> Mitigation Measure 4.12-5c:The project sponsor shall <br /> incorporate design measures and implement fuel <br /> management measures listed in the Wildland Urban <br /> Interface Plan (WUIP is included as Appendix E). <br /> Vegetation management measures included in this Plan <br /> shall continue to be implemented according to the <br /> CC&Rs for the proposed residences, and/or an Open <br /> Space Maintenance District.This Plan presents <br /> measures to: make structures less ignition-prone; make <br /> vegetation burn with less intensity; educate and prepare <br /> residents regarding wildland fire; properly manage fuels <br /> on private lots and in the periphery of the open space; <br /> and ensure that fuel management inspections are <br /> conducted annually. The City shall review and update <br /> the WUIP every five years to ensure that it reflects any <br /> updates to the City's Fire and Building Codes. <br /> 4.14 Energy Conservation <br /> Mitigation Measure 4.14-1: See Mitigation Measure 4.8- See Mitigation See Mitigation See Mitigation See Mitigation Verified by: <br /> 1 in Section 4.8,Air Quality. Measure 4.8-1 Measure 4 8-1. Measure 4.8-1. Measure 4.8-1. <br /> Date: <br /> Mitigation Measure 4.14-2: Prior to issuance of any Project applicant Community Verify inclusion of Prior to issuance Verified by- <br /> Grading or Demolition Permit, the City Engineer and the shall submit Development energy of grading or <br /> Chief Building Official shall confirm that the building plans construction plans Department; conservation demolition permit; <br /> and specifications incorporate the following features incorporating Building Division measures in inspect during <br /> a. Roofs that are strong enough and have roof truss design features in and Engineering applicable construction <br /> spacing to hold photovoltaic panels,where feasible compliance with the Division construction plans Date. <br /> and cost effective, in compliance with Program 7.5 of Energy Element of and specifications; <br /> the Energy Element of the Pleasanton General Plan the General Plan. conduct field <br /> 2005-2025. inspections during <br /> b Solar water heating and/or photovoltaic-ready roofs in construction. <br /> new construction, i.e., roofs with wiring installed for a <br /> roof-mounted photovoltaic system,where feasible, in <br /> compliance with Program 7.5 of the Energy Element <br /> of the Pleasanton General Plan 2005-2025. <br /> LUNI)RANCI I I I-PUD-25 20 JANUARY 2016 <br />