Laserfiche WebLink
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures Implementation Monitoring Monitoring and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> wetlands of the necessary acreage, and develop success <br /> criteria specific to the actual wetland creation design <br /> The mitigation site should be monitored for at least five <br /> years.A detailed wetland restoration plan should be <br /> developed for this mitigation area during the regulatory <br /> permitting phase of the project. The plan will be subject <br /> to the review and approval of the USACE, RWQCB, <br /> CDFG and the City of Pleasanton. This plan should <br /> incorporate additional studies and details, including the <br /> following <br /> • Type and acreage of wetland to be impacted and <br /> goals for wetland creation <br /> • Detailed assessment of soil suitability for wetland <br /> creation <br /> • Description of site hydrology, including depth and <br /> duration of inundation, potential for scour or deposit of <br /> sediments, etc. <br /> • Site preparation measures, including grading <br /> methods,to relieve compaction and/or ensure low <br /> potential for scouring of soils <br /> a Revegetation and erosion control on slopes <br /> surrounding the mitigation site <br /> • Description of buffer areas around the mitigation <br /> • Maintenance program <br /> • Long term monitoring program, including performance <br /> and success criteria. <br /> • Measures to assure protection from human <br /> disturbance and to protect the area from development <br /> in perpetuity. <br /> 4.4 Geology and Soils <br /> Verified by: <br /> Mitigation Measure 4.4-1a: In general, landslide debris Project applicant Community Review and approve Prior to issuance <br /> shall be removed where present and replaced with shall prepare Development corrective grading of grading permit. <br /> engineered fill in accordance with the approved corrective grading Department, plan; ensure that all <br /> corrective grading plan. More detailed information plan in conjunction Engineering recommendations of Field inspections <br /> regarding the location, extent, and depth of the required with project final Division the project during Date: <br /> landslide mitigation shall be depicted on the final project grading plan. geotechnical report construction. <br /> corrective grading plan to be submitted with the final are properly <br /> grading plan, subject to review and approval by the City implemented. <br /> of Pleasanton Building and Safety Services Division <br /> Mitigation Measure 4.4-1b: Landslide repairs shall be <br /> conducted on the natural slope behind Lots 24 and 25 <br /> (Landslide 17) and the proposed cut and fill slope <br /> adjacent to the driveway south of Lots 24 and 25 shall <br /> also be regarded. The finished slopes should be graded <br /> l UND RANCH I I—PUD-25 8 JANUARY 2016 <br />