Laserfiche WebLink
exceed the 15-foot height limit, but may not exceed 25 feet in height as <br /> measured from the lowest grade adjacent to the structure to the <br /> highest ridge or top of the structure. <br /> (Note: The floor area for enclosed accessory structures shall be included <br /> in the sites' floor area ratios.) <br /> e. Architectural projections and/or bay windows shall conform to the <br /> definitions and standards described under Section 18.84.120 of the <br /> Pleasanton Municipal Code. <br /> f. All building heights shall be measured from the lowest to the highest <br /> points of the structure. Projections above the maximum building height for <br /> primary and accessory structures may be allowed provided that they <br /> conform to the definitions and development standards of Section <br /> 18.84.150 of the Pleasanton Municipal Code. <br /> 15. During construction, if the City is under declared drought conditions, all water <br /> used for dust control shall be recycled. <br /> 16. Homeowners shall limit irrigated lawn area to 25 percent of total landscaped area <br /> in rear/back yards. <br /> 17. Prior to building permit approval, the project applicant or developer shall submit a <br /> comprehensive fencing plan with the fence designs and their locations with the <br /> tentative map application for review and approval by the Director of Community <br /> Development. <br /> 18. Fences between 6 and 8 feet in height, which are proposed to be constructed <br /> after building occupancy, shall be subject to the review and approval by the <br /> Director of Community Development according to the standards of the <br /> Pleasanton Municipal Code. <br /> 19. The project developer shall survey the heights of the structures to certify their <br /> conformance to the approved building height as shown on Exhibit B. Said <br /> verification shall be performed by a licensed land surveyor or civil engineer, and <br /> shall be completed and provided to the Department of Community Development <br /> before the first framing or structural inspection of each building on each lot by the <br /> Building Division. The certification shall allow for the installation of finished roof <br /> materials. <br /> 20. Prior to building permit approval for the residential units, the project developer <br /> shall submit plans that provide automatic opening sectional roll-up garage doors <br /> on the garages of the houses covered by this approval. Unless otherwise <br /> approved by the Director of Community Development, the door design and <br /> material shall conform to the PUD development plan. <br /> Page 5 of 30 <br />