TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Implementation Monitoring Monitoring and Monitoring Verification of • <br /> Mitigation Measures Procedures Responsibility, Reporting Action Schedule . Compliance <br /> Mitigation Measure 4.14-2: Prior to issuance of any Project applicant Community Verify inclusion of Prior to issuance Verified by: <br /> Grading or Demolition Permit, the City Engineer and the shall submit Development energy of grading or <br /> Chief Building Official shall confirm that the building plans construction plans Department; conservation demolition permit; <br /> and specifications incorporate the following features: incorporating Building Division measures in inspect <br /> a. Roofs that are strong enough and have roof truss design features in and Engineering applicable during <br /> spacing to hold photovoltaic panels,where feasible compliance with the Division construction plans construction Date: <br /> and cost effective, in compliance with Program 7.5 of Energy Element of and specifications; <br /> the Energy Element of the Pleasanton General Plan the General Plan. conduct field <br /> 2005-2025. inspections during <br /> b. Solar water heating and/or photovoltaic-ready roofs in construction. <br /> new construction, i.e., roofs with wiring installed for a <br /> roof-mounted photovoltaic system,where feasible, in <br /> compliance with Program 7.5 of the Energy Element <br /> of the Pleasanton General Plan 2005-2025. <br /> 20 <br /> LUND RANCI III-PUD-25 JUNE 2015 <br />