My WebLink
|
Help
|
About
|
Sign Out
RES 15811
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2015
>
RES 15811
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 2:44:12 PM
Creation date
12/29/2015 2:44:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/1/2015
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 15811
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Implementation Monitoring Monitoring and Monitoring Verificatiomof. <br /> Mitigation Measures • Procedures Responsibility Reporting Action Schedule Compliance <br /> Mitigation Measure 4.12-5a: During periods of high The project Community Verify completion Prior to issuance Verified by: <br /> fire danger or during red flag conditions, operation of applicant shall Development of Fire Safety of grading or <br /> equipment with small motors for vegetation/landscape implement the Department; Awareness building permit, <br /> maintenance shall be prohibited. All mechanical measures as Planning Division Program and whichever is <br /> equipment shall have approved spark arrestors and specified, including WUIP and sooner; inspect <br /> comply with California Public Resources Code (PRC) the preparation of a compliance with during Date: <br /> Sections 4431,4435, 4442 and 4437 to limit potential Fire Safety the provisions of construction <br /> for ignition of incidental fires. Awareness these plans; <br /> Mitigation Measure 4.12-5b: The project sponsor shall Program. conduct field <br /> prepare a Fire Safety Awareness Program to address inspection during <br /> fire safe behaviors and fuel management. The project construction and <br /> would include the disclosure of the Program's regular <br /> requirements as part of the CC&Rs for the project inspections after <br /> development.Alternatively, in consultation with the project <br /> City,the proposed project could include the formation completion. <br /> of an Open Space Maintenance District to ensure the <br /> implementation of routine maintenance measures for <br /> fire protection purposes. <br /> Mitigation Measure 4.12-5c: The project sponsor shall <br /> incorporate design measures and implement fuel <br /> management measures listed in the Wildland Urban <br /> Interface Plan (WUIP is included as Appendix E). <br /> Vegetation management measures included in this <br /> Plan shall continue to be implemented according to the <br /> CC&Rs for the proposed residences, and/or an Open <br /> Space Maintenance District.This Plan presents <br /> measures to: make structures less ignition-prone; make <br /> vegetation burn with less intensity;educate and <br /> prepare residents regarding wildland fire; properly <br /> manage fuels on private lots and in the periphery of the <br /> open space; and ensure that fuel management <br /> inspections are conducted annually. The City shall <br /> review and update the WUIP every five years to ensure <br /> that it reflects any updates to the City's Fire and <br /> Building Codes. <br /> 4.14 Energy Conservation <br /> Mitigation Measure 4.14-1: See Mitigation Measure 4.8- See Mitigation See Mitigation See Mitigation See Mitigation Verified by: <br /> 1 in Section 4.8,Air Quality. Measure 4.8-1. Measure 4.8-1. Measure 4.8-1. Measure 4.8-1. <br /> Date: <br /> 19 <br /> LUND RANCii II-PUD-25 JUNE 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.