My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
121515
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 11:48:21 AM
Creation date
12/9/2015 11:48:18 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/15/2015
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•, .r. : - F I r t. i i t C c•i'I I!I l".l∎l)rl i't:+L t :1, PHASE I AND 2 DELIVERABLES AND MEETINGS 3 <br /> Based on the traffic forecasts to be developed as part of To summarize,Fehr&Peers will submit the following <br /> the Model Development Tasks,Fehr&Peers will create major deliverables during the study: <br /> Synchro Networks for the following scenarios: 1. Monthly Task Progress Reports(with the 1 <br /> • EPAP(AM and PM peak hours) invoices) <br /> • General Plan Buildout(AM and PM peak hours) 2. Meeting agendas and minutes <br /> 3. Memo summarizing review of existing model Li <br /> Intersection levels of service and vehicle queues will be <br /> calculated.The analysis will consider adjustments in 4. Model Development Report ,_ <br /> peak hour factors,signal timing and phasing,and other 5. Draft and Final Baseline Report <br /> parameters based on the Task 1 discussion. 2 <br /> 6. Updated Travel Demand Model <br /> The initial results will be compared to prior planning <br /> efforts and major changes will be discussed with City Loaded Synchro files for Existing,EPAP and <br /> staff prior to completing the analysis. General Plan Buildout CX <br /> For locations where the level of service is projected to In addition to the kick-off meeting in Task 1,Fehr& <br /> exceed the City's level of service standard or where Peers will attend up to five project meetings during the st <br /> vehicle queues are expected to spill beyond their course of this project and participate in five hour long <br /> available storage length,we will identify potential conference calls.Additional meetings can be attended <br /> with prior authorization by City staff on a time and <br /> improvements for discussion with City staff.For a <br /> budgeting purposes,we have estimated that materials basis. <br /> approximately 20 intersections would require some i,•): 1 i ," i y ; /0 RU`, 1:` 1 ili <br /> level of mitigation. _______________ ____________,_ ______ <br /> As part of this assessment,we will evaluate operations - <br /> ,1,-t <br /> of the Gateway Intersections assuming that planned Once the model is validated for the base year conditions .;,7 <br /> improvements are not implemented.It is envisioned and the future year scenarios have been developed,we <br /> that separate model runs would be conducted as not can provide plots of model output for any of the ?. <br /> completing some Gateway improvements could available scenarios.The most commonly requested task <br /> constrain capacity resulting in a diversion of traffic, is expected to be a select zone analysis.To conduct this 'I <br /> potentially resulting in secondary impacts at other task,we can modify TAZ-specific land uses,run the <br /> intersections.Our level of effort includes rerunning the model,and provide model output to the person or firm ;A <br /> model with roadway network changes,modifying the requesting the information.The cost to provide AM and <br /> intersection turning movement forecasts and <br /> reanalyzing key intersections.The budget would be PM peak hour select zone plots for Existing,EPAP and kr! <br /> General Plan Buildout is provided in the cost estimate. <br /> adjusted if this task is not necessary. <br /> • . , t 1,, <br /> Files for both the updated travel demand model and the 7 <br /> Several interim deliverables will be prepared as part of updated Synchro model will be provided to City staff. <br /> the baseline report task,including: We will provide training sessions to City staff interested r`i <br /> • Technical memorandum summarizing analysis in using the travel demand model for tasks such as <br /> parameters(Task 1) changing localized land use or road network <br /> • Technical memorandum summarizing existing assumptions and running the model to determine <br /> levels of service and queues(Task 2) resulting traffic volumes.We have budgeted fora half d <br /> • Summary of safety assessment(Task 3) day training session in either our Walnut Creek office or r.- <br /> • Technical memorandum summarizing existing the City's offices.We would discuss the City's training <br /> levels of service and queues(Task 4) goals prior to the session such that materials could be ; <br /> tailored to meet staff needs. <br /> The interim technical memorandums will be compiled . , <br /> into a Draft Baseline Report,which will include final Fehr&Peers can update the model as requested by City <br /> documentation of Tasks 1 through 4.Based on editorial of Pleasanton staff.Updates could include modifying -' <br /> comments from City staff on the draft report,we will network assumptions and changing land uses to reflect <br /> prepare a final baseline report. development as it is approved.Some modifications .d <br /> 10 <br /> LI <br />
The URL can be used to link to this page
Your browser does not support the video tag.