My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
121515
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 11:48:21 AM
Creation date
12/9/2015 11:48:18 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/15/2015
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 A;1. '',E P -:a `') .E. ;TS intersections,missing data,or larger than expected <br /> 0 Once the updated Pleasanton traffic model is complete, decrease or increase in traffic volumes as compared to <br /> we will develop traffic projections for two scenarios prior data collection efforts. <br /> o using post processing techniques consistent with <br /> method outlined by National Cooperative lighway rAsl< 2 =\1STr1C3 !,'i rEC;SEC ION °PE({.;ruin; <br /> 0 Research Program(NCHRP). Fehr&Peers will create an existing morning and <br /> evening peak hour Synchro model that reflects current <br /> Existing Plus Approved Projects(EPAP) <br /> traffic signal timings,to be provided by City of <br /> Using the land use and roadway network information Pleasanton staff,and the most recent intersection <br /> El described above for the EPAP scenario,we will apply the <br /> pp y turning movement count effort.Our level of effort is <br /> model to develop morning and evening peak hour based on the Synchro network containing <br /> 53 turning movement forecasts at the intersections to be approximately 150 signalized intersections.We have <br /> included in the Synchro Model update(see Phase 2).The included 16 hours of staff time to spot-check traffic <br /> 0 raw model output will be adjusted based on guidance signal timing and phasing,lane configurations,and turn <br /> provided by NCHRP to adjust model-predicted pocket lengths in the field.Our efforts will prioritize <br /> a intersection approach volumes for differences between areas where roadway Improvements have been <br /> the base year model and the observed counts.The constructed since the preparation of the current <br /> resulting intersection forecasts will be formatted for Synchro model,including the Foothill Road interchange <br /> transfer into the Synchro intersection operations model. improvements and the Stoneridge Drive extension. <br /> General Plan Buildout Based on the updated Synchro networks,we will <br /> in Similar to the EPAP scenario,the General Plan Buildout <br /> evaluate peak hour intersection levels of service using <br /> scenario will represent the future land use and road the Highway Capacity Manual(HCM)2000 method and <br /> l 6 network assumptions developed earlier in the model provide a summary table for discussion purposes prior <br /> update process.The results will be post-processed as to the preparation of the draft Baseline Report.For <br /> -I described above and transferred to the Synchro model. locations that exceed the City's level of service standard, <br /> The transfer of volumes between the travel demand we will discuss if there are planned improvements. <br /> model and the Synchro model will be automated so that Fehr&Peers will also use Synchro 8.0 using the HCM <br /> it is efficient and the potential for errors is minimized. 2000 method to estimate the average and 95th <br /> percentile vehicle queues for the signalized <br /> 3'2 'r'i ` ; • "-1 4 t r(`L ''L fi`l• ' __ __ intersections.For locations where the average vehicle <br /> queue is calculated to exceed the available storage,we <br /> tt The following outlines specific tasks to prepare an will conduct peak period observations to confirm the <br /> updated baseline report.Some tasks would be calculated vehicle queues.We have assumed that up to <br /> El performed in tandem with the Phase 1 -Model Update ten(10)intersections would require field observations to <br /> tasks. confirm calculated queues. <br /> Tiering from the assessment of bicycle and pedestrian <br /> Fehr&Peers will review available data to be provided by collision assessment being prepared as part of the <br /> or identified by the City of Pleasanton,including update to the Bicycle and Pedestrian Master Plan,Fehr& <br /> previous transportation impact assessments,recent Peers will review available Statewide Highway <br /> traffic counts,and existing traffic signal timings.Based Integrated Record System(SWITRS)from the last five <br /> FA on our review of the data,we will develop a set of years. <br /> Synchro base parameters to use in the updated Synchro <br /> model.The results of this review will be summarized in a As part of this task we will prepare hot-spot graphics to <br /> technical memorandum for review and comment by identify high-collision locations,summarize primary <br /> City staff. collision factors,including speeding,improper turning <br /> and right-of-way violations. <br /> As part of this task we will also review the traffic counts <br /> 0 for reasonableness and flag data anomalies,if any,for As an optional task,we will perform field investigation at <br /> 1:9 <br /> discussion with City staff.Data anomalies include up to 10 locations and discuss with City staff potential <br /> volume imbalance between closely spaced counter-measures. <br /> tO <br /> 9 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.