My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
110315
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2015 11:23:22 AM
Creation date
10/28/2015 11:23:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/3/2015
DESTRUCT DATE
15Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Keller Mitchell & Co. <br /> Landscape Architecture <br /> Page 3 <br /> September 17, 2015 <br /> EXHIBIT A <br /> Scope of Services and Work Products: <br /> A. Documentation Scope: Exterior Veteran's Memorial design including plan layout and electrical <br /> engineering. Design shall include a Flag Circle with monuments for the six US Service Branches, <br /> monument base for an artist's sculpture, paving and seating. <br /> B. Project startup and site investigation: <br /> I. Thoroughly review available data including site and survey information. <br /> C. Schematic/Design Development:Provide site studies and associated drawings showing: <br /> 1. Present refined concepts to the Client. <br /> 1 D. Construction Documentation: Based on approved design development drawings,prepare <br /> construction drawings showing: <br /> ICJ <br /> 1. Demolition plan <br /> 2. Dimension plan <br /> 3. Grading and drainage plan <br /> 4. Landscape Construction Details <br /> 5. Electrical plan and details <br /> 6. CSI Specification sections designed by consultant <br /> E. Bid/Permit: Based on approved construction documentation drawings,provide support <br /> F. Construction Administration: <br /> 1. The Landscape Architect shall visit the site 8 times;one kick-off meeting, 6 construction meetings and <br /> one final punch meeting. <br /> 2. The Structural Engineer and Electrical Engineer each shall visit the site one time. <br /> 3. The Landscape Architect shall not be responsible for the construction contractor's performance or <br /> safety measures. <br /> 4. Submittals reviews, RFIs,Plant materials selection at place of growth as requested. <br /> END OF EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.