Laserfiche WebLink
20. The project developer shall survey the heights of the structures to certify their <br /> conformance to the approved building height as shown on Exhibit B. Said <br /> verification shall be performed by a licensed land surveyor or civil engineer, and <br /> shall be completed and provided to the Department of Community Development <br /> before the first framing or structural inspection of each building on each lot by the <br /> Building Division. The certification shall allow for the installation of finished roof <br /> materials. <br /> 21. Prior to building permit approval for the residential units, the project developer <br /> shall submit plans that provide automatic opening sectional roll-up garage doors <br /> on the garages of the houses covered by this approval. Unless otherwise <br /> approved by the Director of Community Development, the door design and <br /> material shall conform to the PUD development plan. <br /> 22. All exterior lighting including landscape lighting shall be directed downward and <br /> designed or shielded so as to not shine onto neighboring properties. Prior to <br /> building permit approval for the residential units, the project developer shall <br /> submit a final lighting plan, and include drawings and/or manufacturer's <br /> specification sheets showing the size and types of light fixtures proposed for the <br /> exterior of the buildings. <br /> 23. Prior to receiving a foundation inspection for each structure, the project <br /> developer shall submit a pad elevation certification prepared by a licensed land <br /> surveyor or registered civil engineer satisfactory to the Director of Community <br /> Development, certifying that the pad elevations and building locations (setbacks) <br /> conform to the development standards for the lots prescribed by this ordinance. <br /> 24. Details of any permanent project identification signage shall be submitted for the <br /> review and approval by the Director of Community Development with the <br /> subdivision improvement plans. <br /> 25. The project shall comply with the current City/Pleasanton Garbage Service <br /> recycling and composting programs. The project developer shall provide <br /> documentation that the number, type, and size of receptacles are adequate and <br /> that pick-up locations are satisfactory to Pleasanton Garbage Services. <br /> 26. A final subdivision map shall be required to subdivide the properties into 50 <br /> buildable lots and remainder parcels for the permanent open space area, creek <br /> areas, bio-retention pond, firebreaks (if required by the Livermore-Pleasanton <br /> Fire Department), etc. With the final map, the project developer shall record <br /> Conditions, Covenants and Restrictions (CC&R's) at the time of recordation of <br /> the final map, which shall create a homeowners association (HOA) or <br /> maintenance association for the development. The HOA or maintenance <br /> association shall be responsible for the maintenance of all stormwater treatment <br /> measures, landscaping between the public sidewalks and street curbs, and the <br /> above-referenced open space areas. The buildings, driveways, landscape, and <br /> Page 5 of 28 <br />