My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
102015
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2015 11:55:11 AM
Creation date
10/14/2015 1:49:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/20/2015
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> replace filter materials to ensure effectiveness and to prevent street <br /> flooding. <br /> f) Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain system <br /> through being windblown or in the event of a material spill. <br /> g) Never clean machinery, equipment, tools, brushes, or rinse containers into <br /> a street, gutter, or storm drain. <br /> h) Ensure that concrete/gunite supply trucks or concrete/plaster operations <br /> do not discharge wash water into street, gutters, or storm drains. <br /> i) Equipment fueling area: Use off-site fueling stations as much as possible. <br /> Where on-site fueling occurs, use designated areas away from the storm <br /> drainage facility, use secondary containment and spill rags when fueling, <br /> discourage "topping off' of fuel tanks, place a stockpile of absorbent <br /> material where it will be readily accessible, and check vehicles and <br /> equipment regularly for leaking oils and fuels. Dispose rags and absorbent <br /> materials promptly and properly. <br /> j) Concrete wash area: Locate wash out areas away from the storm drains <br /> and open ditches, construct a temporary pit large enough to store the <br /> liquid and solid waste, clean pit by allowing concrete to set, breaking up <br /> the concrete, then recycling or disposing of properly. <br /> k) Equipment and vehicle maintenance area: Use off-site repair shop as <br /> much as possible. For on-site maintenance, use designated areas away <br /> from the storm drainage facility. Always use secondary containment and <br /> keep stockpile of cleanup materials nearby. Regularly inspect vehicles and <br /> equipment for leaks and repair quickly or remove from the project site. <br /> Train employees on spill cleanup procedures. <br /> C. Operation Requirements <br /> The Permit's operation and maintenance requirements include but are not <br /> limited to the following: The operation and maintenance of treatment measures <br /> including but not limited to bio-swales, lawns, landscaped areas with deep- <br /> rooted plants, oil/water separator, filterra units, etc., requires completing, <br /> signing and recording an agreement with Alameda County recorder's office in a <br /> format approved by the State and Alameda County. <br /> 28 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.