Laserfiche WebLink
documentation. Failure to comply with the reviewed construction SWPPP <br /> may result in the issuance of correction notices, citations or stop work orders. <br /> 2. The amendments to the SWPPP and all the inspection forms shall be <br /> completed and available at the site for inspection by the city, county or state <br /> staff. <br /> 3. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measure, shall be included in the SWPPP and implemented as approved by <br /> the City. <br /> a) The project developer shall include erosion control/stormwater quality <br /> measures on the final grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the storm drain <br /> system. Such measures may include, but are not limited to, <br /> hydroseeding, hay bales, sandbags, and siltation fences and are subject <br /> to the review and approval of the City Engineer/Chief Building Official. If <br /> no grading plan is required, necessary erosion control/stormwater quality <br /> measures shall be shown on the site plan submitted for an on-site permit, <br /> subject to the review and approval of the Building and Safety Division. <br /> The project developer is responsible for ensuring that the contractor is <br /> aware of and implements such measures. <br /> b) All cut and fill slopes shall be revegetated and stabilized after completion <br /> of grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary <br /> irrigation system to ensure that the grasses are established before <br /> October 15. No grading shall occur between October 15 and April 15 <br /> unless approved erosion control/stormwater quality measures are in place, <br /> subject to the approval of City Engineer/Chief Building Official. Such <br /> measures shall be maintained until such time as permanent landscaping is <br /> place. <br /> c) Gather all sorted construction debris on a regular basis, place it in the <br /> appropriate container for recycling, and empty at least on a weekly basis. <br /> When appropriate, use tarps on the ground to collect fallen debris or <br /> splatters that could contribute to stormwater runoff pollution. <br /> d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked-on mud and dirt from these areas before sweeping. <br /> 27 of 29 <br />