My WebLink
|
Help
|
About
|
Sign Out
SUPPLEMENTAL MATERIAL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
100615
>
SUPPLEMENTAL MATERIAL
>
SUPPLEMENTAL MATERIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2015 12:23:51 PM
Creation date
10/1/2015 12:47:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/6/2015
DESTRUCT DATE
15Y
DOCUMENT NO
SUPPLEMENTAL MATERIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br /> Trip Data <br /> Weekday <br /> Weekday Peak Hour (PM Peak Hour) <br /> Land Use I Size I Unit I Rate I Total <br /> Scenario 1:Existing Conditions <br /> Daycare 120 Students (4PM-6PM) 0.81 97.20 <br /> Church 6.2 1,000 sf (4PM-6PM) 0.55 3.41 <br /> Total Trips 100.61 <br /> Scenario 2:Approved - <br /> Private School(K-8) 207 Students (2PM-4PM) 0.60 124.20 <br /> Church 61.066 1,000 sf (4PM-6PM) 0.55 33.59 <br /> Total Trips 157.79 <br /> Scenario 3a:Proposed Project(25 residences+120 stuo'ents) <br /> Private School(K-8) 120 Students (2PM-4PM) 0.60 72.00 <br /> Residential 25 Dwelling (4PM-6PM) 1.00 25.00 <br /> Total Trips 97.00 <br /> Scenario 36:Proposed Future Project(25 residences+294 students) <br /> Private School(K-8) 294 Students (2PM-4PM) 0.60 176.40 <br /> Residential 25 Dwelling Unit (4PM-6PM) 1.00 25.00 <br /> Total Trips 201.40 <br /> Sunday <br /> Sunday Peak Hour (peak hour) <br /> Land Use I Size I Unit Rate I Total <br /> Scenario 1:.Existing Conditions - <br /> Daycare 120 Students 0.00 0.00 <br /> Church 6.2 1,000sf 12.04 74.65 <br /> Total Trips 74.65 <br /> Scenario 2:Approved _ <br /> Private School(K-8) 207 Students 0.00 1 0.00 <br /> Church 61.066 1,000sf 12.04 735.23 <br /> Total Trips 735.23 <br /> Scenario 3a:Proposed Project(25 residences+120 students) <br /> Private School(K-8) 120 Students 0.00 0.00 <br /> Residential 25 Dwelling 0.86 21.5 <br /> Total Trips 21.50 <br /> Scenario 36:Proposed Future Project(25 residences+294 students) . <br /> Private School(K-8) 294 Students 0.00 0.00 <br /> Residential 25 Dwelling Unit 0.86 21.50 <br /> Total Trips 21.50 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.