Laserfiche WebLink
PROJECT DESCRIPTION <br /> The project consists of a series of related applications that would allow for the <br /> elimination of the existing church use on the site; development of 25 detached single- <br /> family residential units, internal roadways, private but publicly-accessible on-site open <br /> space, and landscaping; operation of a private school with an increase in student <br /> enrollment from the current 120 students to a maximum of 294 students; and <br /> modifications to the existing parking facilities on-site. The requested entitlements <br /> include an amendment to the General Plan land use designation, a PUD rezoning and <br /> development plan, modifications to the previously approved church uses and site plan, <br /> including eliminating the church use, demolishing the existing church structure, retaining <br /> the existing preschool/private school facility as a standalone use, an Affordable Housing <br /> Agreement, and a Growth Management Agreement. The project details are described <br /> fully in the attached Planning Commission and Housing Commission staff reports <br /> (Attachments 8 and 9, respectively). <br /> Since the Planning Commission meeting, the site plan has been modified to address <br /> comments made by the Planning Commission. The modifications include the following: <br /> o Removal of two residential lots located between Private Court B and Busch <br /> Road; <br /> o Addition of an approximately 11,000-square-foot area that would be used as a <br /> publicly-accessible passive recreational area (in the area where two residential <br /> lots were removed) — see Lot B in Figure 2 (below); <br /> o Addition of three on-street parking spaces on Cornerstone Court adjacent to the <br /> Gardens; <br /> o Relocation of the bio-retention area from the school site to the recreational area; <br /> and <br /> o Addition of a separated sidewalk along the southeast side of Private Court B and <br /> along the south side of Cornerstone Court (along the sides of Lots 12 and 13) <br /> Figure 2 on the following page shows the project site plan. Please refer to the Planning <br /> Commission staff report for a detailed project description. <br /> Page 4 of 12 <br />