My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
081815
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 12:19:40 PM
Creation date
8/12/2015 2:19:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/18/2015
DESTRUCT DATE
15Y
DOCUMENT NO
05
Document Relationships
05 ATTACHMENT 2
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2015\081815
05 ATTACHMENT 3
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2015\081815
05 ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2015\081815
Link Groups
Link
1:
05
Last modified:
8/14/2015 12:19:40 PM
Path:
\CITY CLERK\AGENDA PACKETS\2015\081815
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
106. All retaining walls along the public street shall be placed behind the Public <br /> Service Easement (PSE), unless otherwise approved by the City Engineer. <br /> 107. A detailed grading and drainage plan prepared by a licensed Civil Engineer <br /> including all supporting information and design criteria (including but not limited <br /> to any peer review comments), storm drain treatment calculations, <br /> hydromodification worksheets, etc., shall be submitted as part of the <br /> improvement plans. <br /> 108. The minimum grade for the gutter flowline shall be set at one percent where <br /> practical, but not less than .75% unless otherwise approved by the City Engineer. <br /> Fire <br /> 109. The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> 110. Prior to any construction framing, the project developer shall provide adequate <br /> fire protection facilities, including, but not limited to a water supply and water flow <br /> in conformance to the City's Fire Department Standards able to suppress a major <br /> fire. <br /> 111. All fire sprinkler system water flow and control valves shall be complete and <br /> serviceable prior to final inspection. Prior to the occupancy of a building having a <br /> fire alarm system, the Fire Department shall test and witness the operation of the <br /> fire alarm system. <br /> 112. All commercial, industrial, and multi-family residential occupancies shall have <br /> valve tamper and water flow connected to an Underwriters Laboratory (UL) listed <br /> Central Station Service. Fire Department plan check includes specifications, <br /> monitoring certificate(s), installation certificate and alarm company U.L. <br /> certificate. Fire alarm control panel and remote annunciation shall be at <br /> location(s) approved by the Fire Prevention Bureau. All systems shall be point <br /> identified by individual device and annunciated by device type and point. <br /> 113. A Hazardous Materials Declaration shall be provided for this tenant and/or use. <br /> The form shall be signed by the owner/manager of the company occupying the <br /> suite/space/building. No building permit will be issued until the Hazardous <br /> Materials Declaration is provided. The form is available through the permit <br /> center or from the LPFD Fire Prevention Bureau. <br /> 114. Should any operation or business activity involve the use, storage or handling of <br /> hazardous materials, the firm shall be responsible for contacting the LPFD prior <br /> to commencing operations. Please contact the Hazardous Materials Coordinator <br /> at 925/454-2361. <br /> 115. The proposed building(s) may have additional Fire Department requirements that <br /> can only be addressed by knowing the details of occupancy. These occupancy <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.