Laserfiche WebLink
• <br /> (b) For each rated HP or fraction thereof <br /> by which the rating exceeds 10 HP <br /> (maximum any one unit, $20 .00) .40 <br /> (11) Generators, including switchboard and <br /> controlling apparatus : <br /> For each rated K.W. or K.V.A. or fraction <br /> threof (maximum, any one unit, $20 .00) .25 <br /> • <br /> (12) Transformers and balance coils : <br /> (When not part of other apparatus for which <br /> fee is otherwise specified) <br /> For each rated K.W. or K .V.A. or fraction <br /> (maximum, any one bank, $50 .00) .20 <br /> (13) Signs : <br /> (a) Self contained with U.L. label : <br /> i . Install or relocate , each 1 . 50 <br /> ii. Alter electrically 2 .00 <br /> (b) Self contained, without U.L. label : <br /> i. Pre-installation inspection, <br /> each 10 . 00 <br /> ii . Install or relocate , each 1.50 <br /> iii. Alter electrically, each 5 .00 <br /> (c) External illumination for display <br /> or outline : <br /> i . Gas tube, per transformer .50 <br /> ii . Incandescent, per lamp .10 <br /> iii. Fluorescent, per tube .25 <br /> (14) Services, new or change, including one <br /> meter base: <br /> (a) Over 600 volts : <br /> i. First 200 KVA 10 .00 <br /> ii. Over 200 KVA 25 .00 <br /> iii . Meter bases, over one , each .50 <br /> (b) 600 volts or less : <br /> i. First 200 amps 2 .00 <br /> ii . Additional 100 amps or fraction .50 <br /> iii. Meter bases , over one , each <br /> (maximum for any one service, <br /> $25 .00) .50 <br /> (c) Temporary power pole and connected <br /> temporary wiring : <br /> i. For construction purposes 2 .00 <br /> ii . For Christmas tree lots and <br /> similar temporary uses 5 .00 <br /> -5- <br />