0
<br /> 2 . Electrical Permit Fees
<br /> a. Permit filing, each • $ 3 .00
<br /> b. New residential construction: Dwellings and
<br /> apartment houses, including all work regulated
<br /> by Electrical Code: For each 100 square feet
<br /> of gross living area or fraction thereof 1.25
<br /> c. All other work - minimum total fees on elec-
<br /> trical permit 8 .00
<br /> (1) Branch circuits and feeders, each .25
<br /> (2) Outlets , 110-220 volt, for switch,
<br /> light, receptacle :
<br /> (a) First 5 outlets 1 .00
<br /> (b) Over 5 , each .15
<br /> (3) Outlets , over 220 volts , each .25
<br /> (4) Outlets, including attached receptacles,
<br /> when installed not more than 24 inches
<br /> apart, for border, strip, or footlighting
<br /> or outline, decorative , display or group
<br /> lighting, each .05
<br /> (5) Built-in appliances, including outlet,
<br /> each 1 .00
<br /> (6) Lighting fixtures :
<br /> (a) Incandescent, each .10
<br /> (b) Fluorescent, each . 15
<br /> (c) Recessed fixtures, each .20
<br /> (d) Special purpose fixtures, each
<br /> (arc, stereoptican , vapor, flood, spot) .25
<br /> (7) Rectifiers (mercury arc , vibrating,
<br /> electrolytic) Per KW or KV-A or fraction ,
<br /> each (maximum, any one unit , $20 .00) .25
<br /> (8) Heaters (water, space, welders) except
<br /> portable, per kilowatt or kilovolt ampere,
<br /> or fraction (maximum, any one unit, $20 .00) .20
<br /> (9) Motors, including starting and controlling
<br /> apparatus. (Except motors which are part
<br /> of a built-in appliance for which an elec-
<br /> trical fee is required. )
<br /> (a) 0 - 10 horsepower, including, each
<br /> HP or fraction .50
<br /> (b) Over 10 HP per HP, or fraction , over 10 ,
<br /> each (maximum, any one motor - $20 .00) .20
<br /> (10) Motor generator sets , balancer sets , dyna-
<br /> " motors, converters , including control
<br /> apparatus :
<br /> (a) For each rated HP or fraction thereof,
<br /> up to and including 10 HP .60
<br /> -4-
<br />
|