My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:51:41 AM
Creation date
6/12/2015 11:15:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Progress payment processing/progress verification <br /> o On a weekly basis, compile, summarize, return for correction (if needed), <br /> inspectors' daily reports <br /> o Maintaining updated (weekly basis) set of construction documents <br /> incorporating RFIs, COs, as-built information <br /> • Scheduling and coordination of specialty inspections and testing (geotechnical, <br /> material testing, flow control station instrumentation panels (TESCO)) <br /> • Coordination with RMC ESDC staff related to ESDC activities and deadlines <br /> Assumptions: <br /> • Resident Engineer would work directly for the City's Construction Manager and <br /> will be based in the field. <br /> • Resident Engineer will work with City inspectors to monitor field issues and <br /> quality of inspection. <br /> • Resident Engineer will identify issues requiring elevating from field to Resident <br /> Engineer/Construction Manager for resolution <br /> • City will provide suitable field office facilities <br /> • Resident Engineer will have no responsibility for construction site safety, which <br /> shall be the construction contractor's sole responsibility <br /> • Resident Engineer will be trained in the construction contractor's safety <br /> procedures and health and safety plan for the project and will conduct work in <br /> accordance with same <br /> Deliverables: <br /> Develop, maintain and deliver: <br /> • Shop drawing log <br /> • RFI log <br /> • PCO log <br /> • Change Order log <br /> • Draft Change Orders <br /> • Weekly compilations and summaries of inspectors' daily reports <br /> • Updated (weekly basis) set of construction documents incorporating RFIs, COs, <br /> as-built information <br />
The URL can be used to link to this page
Your browser does not support the video tag.