recommending that RMC Water and Environment be retained for these services <br /> during the construction. The estimated contract cost is $297,642. <br /> • Material and geotechnical testing and observation during trenching and backfill <br /> operations are also necessary. These services are required to ensure proper <br /> backfill and compaction of the trench line. By testing the compaction of the native <br /> backfill material, as well as any import backfill material, we hope to avoid any <br /> future settling or other distorting of the trench line. This will protect both the <br /> pipeline integrity and the roadway surface. Staff is recommending the use of one <br /> of our on-call geotechnical consultants, ENGEO Incorporated to provide the <br /> testing at an estimated cost of$67,650. <br /> • Biological monitoring is required by the environmental report for the project and by <br /> the California Fish and Wildlife Department Streambed Alteration Agreement in the <br /> area of the Arroyo Mocho undercrossing. Staff is recommending Pacific Biology <br /> provide these services. Pacific Biology has worked successfully for the City in the <br /> past providing similar services, and has long history of working successfully with <br /> resource agencies. Staff is recommending Pacific Biology be retained to provide <br /> all the monitoring and reporting required for the project at an estimated contract <br /> cost of$69,540. <br /> • There are known (and possible unknown) ancient burial sites in the vicinity of the <br /> proposed pipeline construction. During the construction it is required that an <br /> archeologist be on site during excavation in the vicinity of the known burial sites. <br /> It is also required that we have an archeologist on-call and available should we <br /> discover burial sites during construction. Staff is recommending SMB <br /> Environmental, Inc be retained for the services at an estimated cost of$10,000. <br /> Budget <br /> In addition to the construction contract and consultant agreement amounts, staff <br /> recommends that the construction contingency amount for this project be set at <br /> approximately 10% of the construction contract amount. This contingency will be used in <br /> the event that issues arise during the project, such as the potential for unforeseen utilities <br /> and objects encountered during excavation. <br /> Schedule <br /> The proposed schedule for the subject project is as follows: <br /> Approval of Plans and Specifications and Award of Contract June 16, 2015 <br /> Start of Construction (300 working days) July 2015 <br /> Recycled Water to the Sports Park (150 working days) December 2015 <br /> End of Construction July 2016 <br /> Page 5 of 6 <br />