Assumptions: <br /> • Activity under this task is on an as-needed basis as determined by the City and its CM. <br /> Deliverables: <br /> • Documentation of review and determination of compliance with the contractor's <br /> Excavated Materials Management Plan <br /> • Technical Memorandum with interpretation of lab results and corresponding <br /> recommendations for disposal of contaminated soil and groundwater <br /> Task 10—Proiect Close Out <br /> Task 10.1 — Pipeline Record Drawings <br /> RMC will prepare record drawings for the Project after completion of construction. The record <br /> drawings will be based upon one consolidated set of red line markups provided by the Resident <br /> Engineer and City staff that depicts changes that took place during construction. The record <br /> drawings will also include the pipeline profiles prepared under Task 4. <br /> Assumptions: <br /> • Red line markups provided by the City (originating from the Contractor and CM) will be <br /> clearly legible and without contradictory information, suitable for transfer by CAD staff to <br /> CAD files. <br /> Deliverables: <br /> • Record Drawings (.pdf and AutoCAD 2014 format) <br /> Task 10.2—Documentation <br /> RMC shall summarize and log documentation developed through its ESDC activities, including <br /> preparing final logs of submittals, RFIs, Document clarifications prepared for the Project. <br /> Deliverables: <br /> • Final logs (.pdf and MSExcel format) and Submittals, RFI responses, CDCs (.pdf format) <br /> uploaded to RMC Fileshare site for City download. <br /> Scope of Work 8 March 30,2015 <br /> Recycled Water Infrastructure Expansion—Phase 1A <br /> Engineering Services During Construction <br />