Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> VI. LIVERMORE PLEASANTON FIRE DEPARTMENT * <br /> D. Miscellaneous Fees <br /> Candles and Open Flame in Assembly, per event $160.00 <br /> Camivals and Fairs, per event $300.00 <br /> Exhibits and Trade Shows, per event $470.00 <br /> Pyrotechnical Special Effects show, per show $1,210.00 <br /> Temporary Membrane Structures, per event $190.00 <br /> Seasonal Lots (Xmas, Pumpkin, etc.), each lot $190.00 <br /> Open Buming, each application $130.00 <br /> Alternate Means or Method Application, each $160.00 <br /> Hydrant Flow Test, per area tested $310.00 <br /> Incident Reports, each $5.00 <br /> Licensed Care Facilities - Fire Clearance (other than Single-Family <br /> Home Residential Care), each $330.00 <br /> Dump Houses, each $1,080.00 <br /> Excessive False Alarms, each occurance $390.00 <br /> Outside Plan Checker, per hour $125.00 <br /> UST-Removal up to 2 tanks, per hour $148.96 <br /> UST- Removal 3 or more, per hour $190.00 <br /> UST-Tank top, monitoring system etc., per hour $148.96 <br /> Other Plan Checks and Inspections (Emergency repair/modification <br /> to fire protection systems), per hour $148.96 <br /> Off hours inspections (3 hour minimum charge), per request $148.96 <br /> Asbestos abatement, per hour $148.96 <br /> Compressed Gas System High Hazard, per hour $148.96 <br /> Compressed Gas System High Hazard -additional for projects with <br /> more than one system, per hour $148.96 <br /> High- Rise (charge on hourly), per hour $148.96 <br /> Fire Alarm Monitoring Equipment change/replacement, per hour $148.96 <br /> Fire code assessment/approval change of <br /> occupancy/use/equipment/access, per application $185.00 <br /> Service Required in Excess of Standard (due to size, occupancy <br /> uses or other than local regulations), per hour $148.96 <br /> Fire Monitoring System Only (Water flow, associated equipment, <br /> Central Station), per system $350.00 <br /> • Beginning 1 January 2017 all Livermore-Pleasanton Fire Department fees are subject to <br /> an annual inflation adjustment based upon the latest available monthly Engineering News <br /> Record Construction Cost Index (CCI) for the San Francisco Bay Area as of December of <br /> the previous year. The base index period for inflation adjustment will be the December <br /> 2015 CCI. In addition, the fees will be reviewed every 2 years. <br /> VI. Fire 15 of 15 <br />