Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> VI. LIVERMORE PLEASANTON FIRE DEPARTMENT * <br /> Other Pre-Engineered Suppr System (building, full room system) $870.00 <br /> Fire Standpipe System $940.00 <br /> Fire Alarm System: <br /> up to.15 Initiation devices $690.00 <br /> 16 -50 Initiation devices $870.00 <br /> 51 - 100 Initiation devices $1,110.00 <br /> 101 - 1000 Initiation devices $1,230.00 <br /> for each group of 50 additional devices over 1,000 $200.00 <br /> New Bldg - no special uses $360.00 <br /> TI - no special uses $330.00 <br /> Spray Paint Booth: <br /> up to 2 Spray Paint Booths $780.00 <br /> each additional Spray Paint Booth $50.00 <br /> Propane Tank (LGP) $710.00 <br /> Above Ground Tank Removal: <br /> 60 - 500 gallon $710.00 <br /> 501 -2000 gallon $740.00 <br /> 2000 + gallon $850.00 <br /> Compressed Gas System- non high-hazard $350.00 <br /> Medical Gas- Level 1(Ig) $1,480.00 <br /> Medical Gas- Level 3 $450.00 <br /> Cryogenic Tank $350.00 <br /> Emergency Generator w/ Fuel Tank $350.00 <br /> Propane Exchange Rack $200.00 <br /> Vehicle Access Gate, not part of a building $190.00 <br /> Refrigerant System, each $540.00 <br /> High-Piled storage of combustibles: <br /> Class I-IV 2,500 sq ft- 12,000 sq. ft. $350.00 <br /> Class I-IV 12,001 sq ft-500,000 sq ft $580.00 <br /> High Hazard $810.00 <br /> Smoke Control System $1,300.00 <br /> SPAs, CUP, PUD $320.00 <br /> Each site inspection, after twice failed same inspection $460.00 <br /> Underground Storage Tank (UST) Installation: <br /> up to 2 tanks $2,100.00 <br /> each additional tank $200.00 <br /> VI. Fire 14 of 15 <br />