My WebLink
|
Help
|
About
|
Sign Out
19
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:53:05 AM
Creation date
6/9/2015 4:14:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> HI.ENGINEERING DIVISION * <br /> D. Construction Services Inspection <br /> (due 15 days prior to City Council approval of a final map or City Engineer approval of the plans, whichever <br /> occurs first) <br /> Subdivision Grading& Up to 100,000 cubic yards see Chapter IV <br /> Erosion Control Section F <br /> Inspection each additional 1,000 cubic yards over 100,000 $10.00 <br /> Construction Inspection <br /> City-inspected improvements: Base Fee Plus <br /> Valuation under$5,000 7.2%of valuation <br /> Valuation$5,000-$20,000 $360 2.76%of valuation>$5,000 <br /> Valuation over$20,000 $774 5%of valuation>$20,000 _ <br /> Specialized Inspections Consultant cost <br /> +25% <br /> Overtime Inspection <br /> (2 hour minimum charge) Cost+Overhead <br /> E. Assessment Districts <br /> City Engineering Department Administration <br /> (during formation,design,and construction) Cost+Overhead <br /> Inspection See Construction <br /> (Minimum charge is 4%of costs to construct public improvements) Inspec.Fee Table <br /> Segregation Administration <br /> Fee per district $500.00 <br /> E. Grading Fees <br /> Plan Review Permit <br /> Less than 50 cubic yards Exempt Exempt <br /> 50 to 10,000 cubic yards <br /> first 1,000 cubic yards Time&Material, $194.50 <br /> each additional 1,000 or fraction thereof 1-hour min. $14.50 <br /> 10,001 to 100,000 cubic yards <br /> first 10,000 cubic yards Time&Material, $325.00 <br /> each additional 10,000 or fraction thereof 2-hour min. $66.00 <br /> 100,001 to 200,000 cubic yards <br /> first 100,000 cubic yards Time and Material $919.00 <br /> each additional 10,000 or fraction thereof Basis,Min.$269.75 $36.50 <br /> 201,000 cubic yards or more <br /> first 200,000 cubic yards lime and Material $1,284.00 <br /> each additional 10,000 or fraction thereof Basis,Min$402.25 $36.50 <br /> Beginning 1 January 2017 all City of Pleasanton Engineering fees are subject to an annual inflation adjustment <br /> based upon the latest available monthly Engineering News Record Construction Cost Index(CCI) for the San <br /> Francisco Bay Area as of December of the previous year. The base index period for inflation adjustment will be the <br /> December 2015 CCI. In addition,the fees will be reviewed every 2 years. <br /> 6/10/2015 III. Engineering:4 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.