My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:52:39 AM
Creation date
6/9/2015 4:09:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br /> BUILDING MAINTENANCE—Commercial Interior Services V IDOLO,DV .â–º1Jg <br /> Contractor Name: Signature.° <br /> Contractor to perform the services and furnish the personnel, materials, and equipment to repair, design or <br /> replace any Modular Furniture, Cubicles or Space Planning within City buildings and structures "as required" <br /> on a scheduled and 24-hour emergency basis including overtime if required. <br /> Contractor's Labor rates (Hourly) <br /> Position Description Regular Overtime Emergency <br /> Callout <br /> Foreperson $ g 1 .9g $ 10; . bb' $ /37.34- <br /> Journey Rate $ g I. 92 $ i p 9. b 9 $ 137 .3G <br /> Apprentice Rate $ 3q. Sr6 $ SO. qc $ 1,2 . 04 <br /> Percent of mark-up on material: S.D % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000+ 10%($100)=$1,100 <br /> Percent of mark-up on outside equipment: g 0 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment$2,000+ 10% ($200)=$2,200 <br /> Billing of hours of work will be by 1/4 Hr. 1/2 Hr. 71 Hr. Increments(Select one) <br /> ... 14IPaue <br /> pLEAS.ANTON. <br />
The URL can be used to link to this page
Your browser does not support the video tag.