My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:52:39 AM
Creation date
6/9/2015 4:09:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br /> STREETS— Temporary Street Sienaae Service <br /> Contractor Name:1023 r,\tret.fFt-C. Signature: <br /> St-Lep tdi $ I r\C-- <br /> Contractor to perform the services and furnish the personnel, materials, and equipment to place temporary <br /> traffic signage on City streets "as required" on a scheduled and 24-hour emergency basis including overtime if <br /> required. <br /> Contractor's Labor rates (Hourly) <br /> Position Description Regular Overtime Sunday Emergency <br /> Callous <br /> IrA.-CC,eCu„ 1Lctberer $ (05 $ 5 $ l30 $ °SOD <br /> $ $ $ $ <br /> Contractor's Equipment <br /> Equipment Size & Description Hourly <br /> Rate <br /> Message Boards Uucune J 3- i_i n z_ er i r.1 yy\J >s ecce.—3va-rd $ 513 4 4 -r m ine Muir. <br /> Advance Warning <br /> Signs $'c ire- re—ti lz i }l�11-, Ala re-o'nu� Sic,' (l s'lur•cr $ �j y F tip m n mu r� <br /> Barricades j Pc 1 Woo c_. $ q +kQU( NV cm •un <br /> Traffic Cones S' -1t Re-C((Lei; vt $ cg„ q w r^' <br /> L ^,C.^u ^� <br /> Percent of mark-up on material: t % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100) = $1,100 <br /> °— <br /> Percent of mark-up on outside equipment: % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000 + 10% ($200) = $2,200 <br /> Billing of hours of work will be by 1/4 Hr. ✓ 1/2 Hr. 1 Hr. Increments (Select one) <br /> i�,�.„ 43 ] P a g e <br /> PLEASANTON. <br />
The URL can be used to link to this page
Your browser does not support the video tag.