Laserfiche WebLink
SCOPE OF SERVICES <br /> BUILDING MAINTENANCE— Window Glass Re 'rs <br /> Contractor Name: Team Glass, Inc Signature: <br /> Contractor to perform the services and furnish the personnel, materials, and equipment to repair and/or replace <br /> commercial windows on City buildings and structures "as required" on a scheduled and 24-hour emergency <br /> basis including overtime if required. <br /> Contractor's Labor rates (Hourly) <br /> Position Description Regular Overtime Emergency <br /> Callout <br /> Glazer $ 125.00 $180.00/230.00 $ 180.00/230.00 <br /> $ $ $ <br /> $ $ $ <br /> Percent of mark-up on material: 40-50 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100)=$1,100 <br /> Percent of mark-up on outside equipment: 10 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment$2,000 + 10%($200) =$2,200 <br /> Billing of hours of work will be by 1/4 Hr. X 1/2 Hr. 1 Hr. Increments (Select one) <br /> 28 '1 : ._ <br /> pl.{ASANTO,N <br />