Laserfiche WebLink
INYO CT MOHR AVE END OUF <br /> KLAMATH CT MOHR AVE END OUF <br /> SHASTA CT TANAGER DR END OUF <br /> SHEARWATER CT TANAGER DR END OUF <br /> SHEARWATER RD GREENWOOD RD TANAGER DR OUF <br /> SEA EAGLE CT SHEARWATER RD END OUF <br /> EL DORADO CT TANAGER DR END OUF <br /> MOHR AVE WOODTHRUSH AVE SANTA RITA RD OUF <br /> MOHR AVE SUTTER GATE ST. MCHENRRY GATE WAY OL <br /> GREENWOOD RD VALLEY AVE BLACK AVE OUF <br /> SECRETARIAT DR HOPYARD RD END OUF <br /> DUDLEY CT HOPYARD RD FRONTAGE END SAMI <br /> ELMRIDGE CT HOPYARD RD FRONTAGE END SAMI <br /> GREENTREE CT HOPYARD RD FRONTAGE END OUF <br /> MEADOW WOOD CT HOPYARD RD FRONTAGE END SAMI <br /> FRANCISCO ST SANTA RITA RD KOLLN ST OUF <br /> CORTEZ CT FRANCISCO ST END OUF <br /> PERU CT FRANCISCO ST END OUF <br /> MENDOZA CT FRANCISCO ST END OUF <br /> HANSEN DR 40'E/0 CALLE RICARDO HOPYARD OUF <br /> CALLE MADRAS HANSEN DR END OUF <br /> CORTE TRANCAS CAMINO SEGURA END OUF <br /> CORTE PADRE CAMINO SEGURA END OUF <br /> CORTE MONTANAS CAMINO SEGURA END OUF <br /> CORTE ENCINAS CAMINO SEGURA END OUF <br /> CORTE CERRITOS CAMINO SEGURA END OUF <br /> CORTE ARBOLES CAMINO SEGURA END OUF <br /> CALLE MORELIA HANSEN DR PASEO SANTA CRUZ OUF <br /> CALLE FUEGO CALLE MORELIA CAMINO SEGURA OUF <br /> CORTE VENADO BLACK AVE END OUF <br /> CORTE ESPADA BLACK AVE END OUF <br /> CORTE VERDE PASEO SANTA CRUZ END OUF <br /> CORTE BLANCA _ PASEO SANTA CRUZ END OUF <br /> (*) OL: Overlay <br /> OUF: Overlay with Fabric <br /> SAMI: Stress Absorbing Membrane Interlayer <br /> The following maintenance methods are being utilized for this project: <br /> Overlay: This construction method involves grinding the edges of the existing pavement, <br /> and placing a new surface course of 1.5" or 1.75"thickness of asphalt concrete on top of <br /> the existing pavement. <br /> Overlay with Fabric: This construction method involves grinding the edges of the existing <br /> pavement, and placing a layer of pavement fabric prior to applying a new surface course <br /> of 1.5" or 1.75"thickness of asphalt concrete on top of the existing pavement. <br /> Page 3 of 6 <br />